HomeMy WebLinkAbout0113767 B
No113767
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
JAMES S KITA JR
Job Address714 JACKSON STOwnerCreate Date04/29/2005
DesignerContractorOWNER
Category162 - Wrecking Residential Accessory StructuresPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
Duplex/ Razing the existing accessory building. A determination was made by the Matt Tucker that the current building was not being used for
Use/Nature
parking. The site shall be cleared, leveled and have grass planted to fill in the area.
of Work
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$500.00Plan Approval$0.00Permit Fee Paid$20.00Park Dedication$0.00
04/29/200500/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1005260000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
1020 ALPINE CTOSHKOSHWI549012009
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.