Loading...
HomeMy WebLinkAbout0113743-HVAC (boiler) 113743 CITY OF OSHKOSH No OSHKOSHHVAC PERMIT - APPLICATION AND RECORD ON THE WATER SHEILA TURZENSKI POWERS Job AddressOwner 346 W 9TH AVE Create Date04/28/2005 ContractorMARX MECHANICALCategory500 - Residential-Heating & VentilatingPlan OilElectric üü GasSolarSolid Fuel New üü ReplaceOther System Forced AirRadiantSteamA/CVent Electric üü Hot WaterSuppl.Con. Burner Chimney TypeChimney AChimney BDirect VentNot Applicable Heat LossAs ApprovedExistingNot ApplicableValue0 As Per PlanVariableOther BTU RateValue77000 Use/Nature SFR/ Replace boiler with Weil Mclain Model GGa-4 No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR of Work CONNECTION OF THIS APPLIANCEWhere an appliance is permanently disconnected from an existing chimney or vent (C/V), the C/V shall be resized as necessary to control flue gas condensation in the interior of the C/V and to provide the appliance or appliances served with the req. draf Plan Approval$0.00 Fees: Valuation$3,295.00Permit Fee Paid$54.50 Issued By:Date04/28/2005 Permit Voided Parcel Id #0903100000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner Address4535 STATE ROAD 91OSHKOSHTelephone Number920-235-6510 WI54904-6304 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.