HomeMy WebLinkAbout05-110.doc APRIL 26, 2005 05-11 0 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO. 1/ PUBLIC WORKS CONTRACT NO. 04-12 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: VINTON CONSTRUCTION CO. PO BOX 1987 MANITOWOC, WI 54221-1987 Net Increase to contract: $143,073.94 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Accl. No. 541-1810-1799-00000 Water Utility - Construction in Progress Accl. No. 551-1910-1799-00000 Sewer Utility - Construction in Progress TO: Vinton Construction Co. P. O. Box 1987 Manitowoc, WI 54221-1987 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET INCREASE TO SECTION I - SANITARY SEWER: NET INCREASE TO SECTION 11- WATER MAIN: NET DECREASE TO SECTION 111 - STORM SEWER: NET INCREASE TO CONTRACT: Recommended: I'. lJ"';J c... ~ ~ Director of Public Works CHANGE ORDER # 1 DATED: April 5, 2004 04-12 , is hereby amended $80,054.48 $69,091.21 ($6,071.75) $143,073.94 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: ~¿V~ .. Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, unç!er the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT: 04-12 CHANGE ORDER # 1 SECTION I- SANITARY SEWER ". INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1. Furnish and install approx. 1,650 linear feet of 8" Sanitary Sewer New/Relay, complete as specified, per linear foot 1,650.00 1,593.51 -56.49 $60.10 ($3,395.05) 2. Furnish and install approx. . 820 linear feet of 10" Sanitary Sewer Relay, complete as specified, per linear foot 820.00 816.52 -3.48 $65.00 ($226.20) 3. Furnish and install approx. 15 linear feet of 10" Sanitary Sewer Insert, complete as specified, per linear foot' 15.00 15.00 $100.00 4. Furnish and install approx. 170 linear feet of 4" Sanitary Lateral, complete as specified, per linear foot 170.00 158.50 -11.50 $39.00 ($448.50) 5. Extend and/or reconnect approx. thirteen (13) Sanitary Laterals, complete as specified, each 13.00 13.00 $360.00 6. Furnish and install approx. 121 vertical feet of std. Sanitary Manhole (4' Inside Diameter), complete as specified, in 13 locations without castings, per vertical foot 121.00 134.86 13.86 $165.00 $2,286.90 7. Remove and relocate existing sanitary manhole on Louise Court, complete as specified, lump sum 1.00 1.00 $3,000.00 8. Abandon approx. three (3) Sanitary Manholes, complete as specified, each 3.00 3.00 $550.00 9. Approx. 2,800 linear feet of sawing, complete as specified, per linear foot 2,800.00 3,711.00 911.00 $3.52 $3,206.72 10. Remove and replace approx. 1,270 square yards of 8" non-reinforced concrete pavement, including curb, complete as specified, per square yard 1,270.00 1,528.10 258.10 $34.01 $8,777.98 Page 1 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 11. Remove and replace .. approx. 350 square feet of ("' 4" - 6" sidewalk or driveway, complete as specified, per square foot 350.00 2,077.80 1,727.80 $4.10 $7,083.98 12. Furnish and install approx. 945 pavement ties, complete as specified, each 945.00 634.00 -311.00 $6.72 ($2,089.92) 13. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION 1- (BID ITEMS 1 -13) - SUB-TOTALS $21,355.58 ($6,159.67) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Repair broken water seNice to city lift station, Bowen St. & E. Murdock Ave., lump sum, 9/2/04 1.00 1.00 $1,000.00 $1,000.00 2 Remove existing abandoned 42" CMP storm sewer and backfill trench with gravel, lump sum, 9/8/04 - 9/10/04 1.00 1.00 $6,463.50 $6,463.50 3 Pump down water from abandoned 42" storm sewer prior to removal, lump sum, 9/7/04 - 9/10/04 1.00 1.00 $700.00 $700.00 4 Redesign new sanitary MH at E. Murdock Ave. and Grove St. due to different conditions, lump sum, 9/16/04 1.00 1.00 $2,495.00 $2,495.00 5 Extra time to abandon 2 existing sanitary mhs at E. Murdock Ave. and Grove St. that were encased in concrete, lump sum, 9/16/04 1.00 1.00 $1,760.00 $1,760.00 6 Rock removal at E. Murdock Ave. and Oak St., 2 hr. crew time, lump sum, 9/22/04 1.00 1.00 $800.00 $800.00 Page 2 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 7 Install new sanitary lateral to NW corner of E. Murdock Ave. and Evans St., lumo sum, 9/23/04 1.00 1.00 $4,986.50 $4,986.50 8 Remove and replace approx. 1186 linear feet of curb section on E. Murdock Ave., originally planned to remain, per linear ft. $12.36 $14,658.96 1,186.00 1,186.00 9 Additional terrace restoration on E. Murdock Ave. due to total curb removal, lumo sum 1.00 1.00 $3,786.00 $3,786.00 10 Remove and replace 8" concrete approach and sidewalk at Fire Station on E. Murdock Ave., lump sum 1.00 1.00 $1,415.81 $1,415.81 11 Approx. 49.5 tons of extra stone material needed" under pavement replacement on E. Murdock Ave., oer ton 49.50, 49.50 $7.50 $371.25 12 Extra barricades for additional patches required by city, lump sum 1.00 1.00 $870.00 $870.00 13 Extra High Early Strength ~ 8" concrete pavement removal and replacement on E. Murdock Ave., per sq. yd. 655.00 655.00 $39.01 $25,551.55 ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 -13). SUB-TOTAL $64,858.57 $0.00 NET INCREASE TO SECTION I . $80,054.48 SECTION II. WATER MAIN ITEM CONTRACT INSTALLED NET NET COSTPER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 14. Furnish and install approx. 290 linear feet of 6" Ductile Iron Water Main w/polywrap, complete as specified (fittings not included), per linear foot 290.00 314.00 24.00 $68.80 $1,651.20 Page 3 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 15. Furnish and install approx. 560 linear feet of 8" Ductile Iron Water Main with natural backfill and pofywrap, complet~ as specified, (fittings not included), per linear foot 560.00 536.00 -24.00 $48.00 ($1,152.00) 16. Furnish and install approx. 3,230 linear feet of 8" Ductile Iron Water Main with gravel backfill and pofywrap, complete as specified, (fittings not included), per linear foot 3,230.00 3,241.50 11.50 $62.30 $716.45 17. Furnish and install approx. 1 ,220 linear feet of 1" Water SeNice (Relay and New), complete as specified, not including corporation and stop box, per linear foot 1,220.00 1,235.00 15.00 $68.00 $1,020.00 18. Furnish and install approx. 40 linear feet of 2" Water SeNice (Relay and New), complete as specified, not including corporation and stop box, per linear foot 40.00 36.00 -4.00 $78.00 ($312.00) 19. Furnish and install approx. 34 1" corporation and stop box with rod, complete as specified, each 34.00 40.00 6.00 $275.00 $1,650.00 20. Furnish and install approx. two (2) 2" corporation and stop box with rod, complete as specified, each 2.00 2.00 $650.00 21. Reconnect approx. two (2), 1" Water SeNices, complete as specified, each 2.00 2.00 $400.00 22. Reconnect existing 4" Water SeNice to 1100 Witzel Avenue, complete as specified, with all fittings and valves, lump sum 1.00 1.00 $2,000.00 23. Furnish and install approx. 13, 8" x 6"Tees, complete as specified, each 13.00 13.00 $260.00 Page 4 CONTRACT: 04-12 CHANGE ORDER# 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 24, Furnish and install approx. six (6), 8" x 8" Tees, complete as specified, ' each 6.00 6.00 $240.00 25. Furnish and install approx. three (3), 8" x 6" Reducers, complete as specified, each 3.00 10.00 7.00 $160.00 $1,120.00 26. Furnish and install approx. 19 6" - 45 degree Bends, complete as specified, each 19.00 10.00 -9.00 $220.00 ($1,980.00) 27. Furnish and install approx. 25 8" - 45 degree Bends, complete as specified, each 25.00 25.00 $260.00 28. Furnish and install approx. five (5), 8" - 22 1/2 degree Bends, complete as specified, each 5.00 3.00 -2.00 $260.00 ($520.00) 29. Furnish and install approx. 14 6" Valves, complete as specified, each 14.00 14.00 $650.00 30. Furnish and install approx. 17 8" Valves, complete as specified, each 17.00 16.00 -1.00 $860.00 ($860.00) 31. Fumish and install approx. two (2) 6" x 6" Tapping Valves and Sleeves, complete as specified, each 2.00 2.00 $1,985.00 32. Fumish and install approx. two (2) 6" Metering Water Valve Manholes for Patrician Village, complete as specified, lump sum 1.00 1.00 . $29,600.00 33. Raise 16" Water Main at E. Murdock Avenue and Bowen Street, complete as specified, with 16",45 deQree Bends, lump sum 1.00 1.00 $7,500.00 34. Fumish and install approx. nine (9) Hydrants, complete as specified, each 9.00 9.00 $1,950.00 35. Remove and relocate Hydrant at end of Louise Court, complete as specified, lump sum 1.00 1.00 $800.00 36. Abandon 6" Water Main on Witzel Avenue, complete as specified, lump sum 1.00 1.00 $10,000.00 Page 5 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 37. Abandon existing 6" x 6" cross atW. 7th Avenue and Wyoming Street, complete as specified, lump sum 1.00 1.00 $1,100.00 38. Approx. 2,950 linear feet of sawing, complete as specified, oer linear foot 2,950.00 2,943.00 -7.00 $3.42 ($23.94) 39. Remove and replace approx. 70 square yards of 7" non-reinforced concrete pavement, including curb, complete as specified, per square yard 70.00 69.15 -0.85 $54.80 ($46.58) 40. Remove and replace approx. 3,500 square yards of 8" non-reinforced concrete pavement, including curb, completê as specified, per square yard 3,500.00 3,234.90 -265.10 $34.01 ($9,016.05) 41. Remove and replace approx. 1,270 square feet of 4" - 6" sidewalk or driveway, complete as specified, per square foot 1,270.00 3,461.30 2,191.30 $3.82 $8,370.77 ". 42. Furnish and install approx. 970 pavement ties, complete as specified, each 970.00 1,076.00 106.00 $6.72 $712.32 43. Remove and replace .. approx. 380 square yards of 3 1/4" hot-mixed asphaltic pavement, complete as specified, per sqûáre')íåi'd 380.00 141.10 -238.90 $41.00 ($9,794.90) 44. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION II. (BID ITEMS 14 - 44) - SUB-TOTALS $15,240.74 ($23,705.47) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE Page 6 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Increased costs for metering mhs due to a change from6' dia. mhs to 12' x 10' structures, lump sum 1.00 1.00 $6,730.00 $6,730.00 2 Approx. 44 tons extra stone base needed under pavement replacement on Witzel Ave., oer ton 44.00 44.00 $7.50 $330.00 3 Increased landscaping costs on Witzel Ave. due to increased amount of sidewalk and driveway removal, lump sum 1.00 1.00 $1,889.00 $1,889.00 4 Approx. 1,255 feet of extra concrete sawing on Witzel Avenue, per foot 1,255.00 1,255.00 $2.50 $3,137.50 5 Approx. 508.3 sq. yds. of extra high early strength 8" concrete pavement removed and replaced on Witzel Avenue, per sq. yd. 508.30 508.30 $39.01 $19,828.78 6 Remove and replace approx. 2,857.9 sq. yds. of 31/4" hot-mixed asphaltic pavement and at adjusted price, per SQ, vd. 2,857.90 2,857.90 $15.97 $45,640.66 - ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 .3) . SUB-TOTAL $77,555.94 $0.00 $69,091.21 NET INCREASE TO SECTION 11- SECTION III - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 45. Provide and install 6" Storm Lateral for 1361 Waugoo Avenue, complete as specified, lump sum 1.00 1.00 $3,600.00 46. Provide and install 6" Storm Lateral for 1213 FaiNiew Street, complete as specified, lump sum 1.00 1.00 $6,800.00 47. Provide and install 8" Storm Sewer at Jefferson Street and E. Lincoln Avenue, complete as specified, lump sum 1.00 0.00 -1.00 $10,100.00 ($10,100.00) Page 7 CONTRACT: 04-12 CHANGE ORDER # 1 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 48. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION III - (BID ITEMS 1 - 3 ) - SUB.TOTALS $0.00 ($10,100.00) ADDITIONAL WORK REQUIRED: C.O. # 1 . SECTION III ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Remove and rebuild catch basin on E. Murdock Ave at Fire Station, 9/15/04 lump sum 1.00 1.00 . $1,885.20 $1,885.20 2 Replace catch basin at SW corner of E. Murdock Ave. & Hazel St., lump sum, 9/24/04 1.00 1.00 $1,461.30 $1,461.30 3 Replace inlet lead to existing inlet on Witzel Ave. at Lark St. (N), lump sum, 9/27/04 1.00 1.00 $681.75 $681.75 ADDITIONAL WORK: C. O. # 1 . (ITEMS 1 -3) . SUB-TOTAL $4,028.25 $0.00 NET DECREASE TO SECTION III ($6,071.75) $183,039.08 ($39,965.14) NET INCREASE TO SECTIONS I, II, III NET DECREASE TO SECTIONS I, II, III NET INCREASE TO CONTRACT: $143,073.94 Page 8