Loading...
HomeMy WebLinkAbout2005-Building (fence) e OSHKOSH ON THE WATER Job Address 1500 ADAMS AVE CITY OF OSHKOSH No 113666 BUILDING PERMIT - APPLICATION AND RECORD Owner JON W/CONSTANCE WARNING Create Date 04/22/2005 Designer Contractor OWNER Category 251 - Fences Plan Type 10 Building 0 Sign 0 Canopy . Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 SFR/ Construct fence to enclose rear yard as per plans - Fence within 25 ft of Hawk St. is limited to max 4 ft high from existing grade and must be a minimum 50 % open without solid top and bottom horizontal rails. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,200.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 04/22/2005 Final/O.P. 00/00/0000 U Permit Voided I Parcelld # 1603280400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1500 ADAMS AVE Agent/Owner OSHKOSH WI 54902 - 3316 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ..ry ';) ~ ) ,~ 42' BOTTOM OF ¿i:::¿ õD '" @ '7 r- x {4)t{ , Go" 4 iI ¡SOD ~rn5 ;JtJ-L '" V>NODV 36' EOTTDM OF GLASS TO GROUND '. @ 4/11 5 s+ , N iI <' 4 "---- it If' iI ". @ i'-- 0 iI ~ A <i ~. 4 '". " " 4 €V '" ~ iI iI Q <M s:-> ~ ¡g iI: <i oil iI 61