Loading...
HomeMy WebLinkAbout0113569-Plumbing CITY OF OSHKOSH 113569 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address1900 S KOELLER STOwnerDAYTON HUDSON CORPCreate Date04/19/2005 ContractorTOWER MECHANICAL SERVICES INCCategoryPlanSTATE REVIEW 440 - Industrial-Interior 0 Water Softner Bathtub0Shower00Wait. St.0Shamp Sink0Coffee Maker 00 WhirlpoolFloor DrainIce ChestFlr/Wst Sink 09Local Waste00Int Grease Trap Clothes Wshr Lavatory10Lndry Tray00Exam Sink0Catch Basin0Ext Grease Trap0 0 ToiletWash Ftn 8Disposal0BidetSculry Sink10RPZ Valve 0 Dishwasher Res. Sink0Beer Tap0Hand Sink1Urinal2Eye Wash Statn 1 0 Bar Sink 0Sump Pump0Lab Sink0Plaster Sink0Standp Rec0Wtr Sewer Mtrs0 Water Heater2Classrm SinkSterilizerSurgeons SinkIce MakerDeduct Meters 00000 Site Drain10Breakrm SinkDip WellF Prep SinkGar DrainWtr Usage Mtrs 2 0000 Drink FtnServ Sink Roof Drain1Ejector/GrindSoda Disp 0200 Misc. 0 Fixtures Use/Nature of Work PHARMACY ADDN & REMODEL KITCHEN AND BATHROOMS SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 1307440105 $0.00Permit Voided Valuation$65,000.00Plan ApprovalPermit Fees$343.00 Issued ByDate04/19/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 2552OSHKOSHWI54903-2552Telephone Number426-3005 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.