HomeMy WebLinkAbout0113643-Building (landing w/steps)
e
OSHKOSH
ON THE WATER
Job Address 2641 SHOREWOOD DR
CITY OF OSHKOSH
No
113643
BUILDING PERMIT - APPLICATION AND RECORD
Owner
DONALD G/LiNDA MACCO
Create Date
04/22/2005
Designer
Contractor
OWNER
Category
142 - Decks, Patios, Ramps
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
8 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
SFR/ Constructing a 4'x6' landing with steps off the rear patio door. This exit will disperse onto a stone patio. The patio will not extend beyond
he rear of the house.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 04/22/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1524240000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1158 PARK VILLAGE DR
Agent/Owner
NEENAH
WI 54956 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: dlP 4 \ 3\\"ß\èCc,-\X'JL>b
PROPER~~~ONTRACTOR:
CONSTRUCTION DATA: W New Construction 0 Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING:
0 Alteration
Li4-!\J) ì ,V!..: ~ ?A=iìù
COMPLIANCE CHECKLIST
DEFICIENT
DEFICIENT
0 Use
0 Lot Width
0 Lot Area
0 Lot Area Per Family
0 Flood Plain
0 Front Yard
0 Front Yard Side Street
0 Rear Yard
0 Side Yards
0 Building Area
0 Parking Standards
0 Off-Street Loading Standards
0 Vision Clearance
0 Transitional Yard Standards
COMMENTS:
DEFICIENT
0 Landscape Standards
0 Height
0 Conditions of Approval
0 Compliance with P.C. or
BZA Conditions of Approval
0 Sign age Standards
0 Mechanical Equip. Screening
0 Parking Lot Lighting
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must
approve aI/ plans, except the fol/owing: (1) Alterations or interior work when the use is conforming and when no change in
use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is
proposed.
~PPROVED
Plan Commission Action Required
0 DENIED
- RE:~::::~:~qUired¡lÅ IJXr (/¿æ~
DATE:
1l~o/D~
2003
'-\""U-O
< "IIl';:;J¿o'
1
(
I
r
i
I
(
I"~
8'
- .. 1-1-"/
\1: I."
\()/ &~p..S"'> ß;A.Ç('.è..-
511
z.'7'
\~'(.,"
it~
fI'
"
/I. S" L- ~ ,,::)V
10'(,"
L",+\ 1;)-.
z..'"
_8'-
1"7' I: IJ
.z
'Z.S" \
.i)r;-.>Q."","'1
.- -s:l\-ÑM.<:.e.
---- --- - -
. - - - --
130'
,
I
\
I
\
-* ~
--If l"tí3)' ~