Loading...
HomeMy WebLinkAbout0113360-Plumbing (interior) CITY OF OSHKOSH 113360 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address3115 WHITE TAIL LNOwnerWAUKAU LLCCreate Date01/18/2005 ContractorWATTERS PLUMBINGCategoryPlanE8-133-0105-P 440 - Industrial-Interior 0 Water Softner Bathtub5Shower50Wait. St.0Shamp Sink0Coffee Maker 00 WhirlpoolFloor DrainIce ChestFlr/Wst Sink 05Local Waste00Int Grease Trap Clothes Wshr Lavatory10Lndry Tray05Exam Sink0Catch Basin0Ext Grease Trap0 0 ToiletWash Ftn 10Disposal5BidetSculry Sink00RPZ Valve 0 Dishwasher Res. Sink5Beer Tap0Hand Sink0Urinal0Eye Wash Statn 5 0 Bar Sink 0Sump Pump0Lab Sink0Plaster Sink0Standp Rec5Wtr Sewer Mtrs0 Water Heater5Classrm SinkSterilizerSurgeons SinkIce MakerDeduct Meters 00050 Site Drain0Breakrm SinkDip WellF Prep SinkGar DrainWtr Usage Mtrs 0 0000 Drink FtnServ Sink Roof Drain0Ejector/GrindSoda Disp 0000 Misc. 0 Fixtures Use/Nature COMM/ 5 Unit Condo, 5 two bedroom units with 2 car attached garages. of Work SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 $0.00Permit Voided Valuation$22,425.00Plan ApprovalPermit Fees$490.00 Issued ByDate04/08/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 118MENASHAWI54952-0118Telephone Number920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.