HomeMy WebLinkAbout05-98.doc APRIL 12, 2005 05-98 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO. 2/ PUBLIC WORKS CONTRACT NO. 04-07 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: VINTON CONSTRUCTION CORP. PO Box 1987 Manitowoc, WI 54221 Net decrease to contract: ($395,045.40) PURPOSE: See attached Change Order " . TO: VINTON CONSTRUCTION CORP P. O. BOX 19~7 . MANITOWOC, WI 54221 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO SECTION I - CONCRETE PAVING: NET DECREASE TO SECTION II - STORM SEWER: NET INCREASE TO SECTION 111- SANITARY SEWER: NET DECREASE TO SECTION IV - WATER MAIN: NET DECREASE TO CONTRACT: Recommended: J)c..J Co. P ~ Director of Public Works CHANGE ORDER # 2 DATED: March 17,2005 04-07 , is hereby amended ($362,057.29) ($18,290.20) $24,679.20 ($39,377.11 ) ($395,045.40) CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: ~ ¡j/~ ) Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT: 04-07 CHANGE ORDER # 2 SECTION I - CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1. Approx. 5,060 square yards of pavement removal, complete as soecified, oer SQuare yard 5,060.00 5,021.40 -38.60 $2.50 ($96.50) 2. Approx. 28,800 square feet of sidewalk and driveway removal, complete as specified, per square foot 28,800.00 29,193.20 393.20 $0.25 $98.30 3. Approx. 13,240 cubic yards of excavation, complete as , specified, per cubic yard 13,240.00 12,702.10 -537.90 $6.56 ($3,528.62) 4. Approx.17,475 tons of excavation (special), on streets"A", "B", and Dawes Street, complete as soecified, oer ton 17,475.00 5,149.79 -12,325.21 $9.35 '$115,240.71) 5. Approx. 21,075 square yards of 7" non-reinforced concrete pavement, including integral curb and grading (base in place), complete as specified, per square vard 21,075.00 21,148.20 73.20 $19.30 $1,412.76 6. Approx. 4,150 square yards of 7" non- reinforced concrete pavement, including integral curb and grading (without base), complete as specified, per square yard 4,150.00 2,181.70 -1,968.30 $19.30 ($37,988.19) 7. Approx. 21,800 square yards of 7" non- reinforced concrete pavement, including integral curb, 5" base material & grading, complete as specified, per SQuare vard 21,800.00 22,016.20 216.20 $20.88 $4,514.26 8. Approx. 1,290 square yards of 8" non- reinforced H.E.S. concrete pavement, including integral curb and grading (without base), complete as specified, per square yard 1,290.00 489.00 -801.00 $28.73 ($23,012.73) Page 1 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE . PRICE 9. Approx. 1,810 square yards of 8" non- reinforced H.E.S. concrete pavement, including integral curb, 6" base material & grading, complete as specified, per SQuare yard 1,810.00 1 ,482.30 -327.70 $32.15 . ($10,535.56) 10. Approx. 2,355 linear feet of 12" wide radius curb head, complete as specified, per linear foot 2,355.00 2,161.40 -193.60 $1.00 ($193.60) 11. Approx. 320 linear feet of 18" curb & gutter, complete as sþeë:ified, per linear foot 320.00 305.20 -14.80 $14.00 ($207.20) 12. Approx. 90 linear feet of standard 24" curb & gutter, complete as specified, per linear foot 90.00 106.40 16.40 $15.62 $256.17 13. Approx. 600 linear feet of standard 30" curb & gutter, complete as specified, per linear foot 600.00 612.80 12.80 $13.72 $175.62 14. Approx. 200 linear feet of standard 36~' curb & gutter (mountable), complete as specified, oer linear foot 200.00 193.80 -6.20 $15.72 ($97.46) 15. Approx. 29,150 square feet ' of 4" concrete sidewalk, complete as specified, per sQuare foot 29,150.00 27,299.20 -1,850.80 $2.39 ($4,423.41) 16. Approx. 41,720 square feet of 6" concrete sidewalk & driveway, complete as specified, per SQuare foot 41,720.00 32,137.20 -9,582.80 $2.81 ($26,927.67) 17. Approx. 50 square yards of 3" thick asphaltic concrete driveway, complete as specified, per square yard 50.00 129.50 79.50 $41.59 $3,306.41 18. Approx. 30 square yards of 5" thick asphaltic concrete driveway, complete as specified, per square yard 30.00 0.00 -30.00 $38.99 ($1,169.70) 19. Approx. 1,280 square yards of 3" asphaltic concrete transition, complete as specified, per square yard 1,280.00 1,276.40 -3.60 $21.94 ($78.98) Page 2 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 20. Approx. 890 square yards of 5" asphaltic concrete transition, complete as specified, per square yard 890.00 869.30 -20.70 $25.60 ($529.92) 21. Approx. 915 square yards of 5" asphaltic concrete transition (base in place), complete as specified, per square yard 915.00 884.04 -30.96 $20.85 ($645.52) 22. Furnish and install approx. 27,160 tons of crushed stone base course, complete as specified, per ton 27,160.00 5,879.02 -21,280.98 $6.29 ($133,857.36) 23. Approx. 3,410 linear feet of sawing, complete as specified, per linear foot 3,410.00 3,043.60 -366.40 $2.00 ($732.80) 24. Furnish and install approx. 668 pavement ties (epoxy coated), complete as specified, each 668.00 817.00 149.00 $5.00 $745.00 25. Adjust approx. 258 manholes and inlets, complete as specified, each 258.00 243.00 -15.00 $210.00 ($3,150.00) 26. Furnish and install approx. 2,620 linear feet of No.4 reinforcing bars (epoxy coated), complete as ! specified, per linear foot 2,620.00 1,680.00 -940.00 $0.72 ($676.80) 27. Furnish and install approx. 8 trees, complete as specified, each 8.00 8.00 $225.00 28. Remove approx. 257. I.D. of trees and stumps, complete as specified, per inch diameter 257.00 146.00 -111,00 $16.00 ($1,776.00) 29. Terrace work on Ashland Street, complete as specified, lump sum 1.00 1.00 $2,000.00 30. Terrace work on Church Avenue, complete as specified, lump sum 1.00 1.00 $1,500.00 31. Terrace work on Dawes Street, complete as specified lump sum 1.00 1.00 $900.00 32. Terrace work on Georgia Street, complete as specified, lump sum 1.00 1.00 $3,500.00 33. Terrace work on Huron Avenue, complete as specified, lump sum 1.00 1.00 $900.00 Page 3 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 34. Terrace work on Isaac Lane, complete as specified, lump sum 1.00 1.00 $7,000.00 35. Terrace work on Jacob Avenue, complete as specified, lump sum 1.00 1.00 $3,200.00 36. Terrace work on Minnesota Street, complete as specified, lump sum 1.00 1.00 $3,500.00 37. Terrace work on W. Nevada Avenue, complete as specified, lump sum 1.00 1.00 $6,000.00 38. Terrace work on Osborn Avenue (includes Rugby Street restoration), complete as specified, lump sum 1.00 1.00 $4,000.00 39. No Bid Item 40. Terrace work on Proposed Road "A", complete as specified, lump sum 1.00 0.00 -1.00 $5,600.00 ($5,600.00) 41. Terrace work on Proposed Road "B", complete as specified, lump sum 1.00 1.00 $2,500.00 42. Terrace work on Sandhill Court, complete as specified, lump sum 1.00 1.00 $2,000.00 43. Terrace work on Shore Preserve Drive, complete as specified, lump sum 1.00 1.00 $14,000.00 44. Terrace work on Shorebird Court, complete as specified, lump sum 1.00 1.00 $2,000.00 45. Terrace work on State Street island, complete as specified, lump sum 1.00 1.00 $500.00 46. Terrace work on Wood Duck Court, complete as specified, lump sum 1.00 1.00 $1,000.00 47. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION 1- (BID ITEMS 1 - 47) - SUB-TOTALS $10,508.52 ($370,468.73) ADDITIONAL WORK REQUIRED: C.O.# 2 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE Page 4 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Construct 217.3 sq. yds concrete base course at Minnesota St. & W. 17th Avenue in lieu of 3" asphalt transition, per sq. yd. 217.30 217.30 $27.00 $5,867.10 2 Extra work to sawcut & construct wheel chair ramp at Ashland St. and Huron Ave., lump sum 1.00 1.00 $110.00 $110.00 3 Prune & backfill exposed roots for trees at 1502 Central St. and 124 W. Nevada Ave., lump sum 1.00 1.00 $629.00 $629.00 4 Construct concrete base course on W. 17th Avenue from the east side of Oregon St. to Minnesota Street in lieu of asphaltic binder, lump sum 1.00 1.00 $3,909.00 $3,909.00 5 Remove asphalt & gravel in paved terrace at South Park on Georgia Street, lump sum 1.00 1.00 $367.50 $367.50 6 Extra terrace fill and compaction in Shore Preserve Subdivision, lump sum 1.00 1.00 $2,109.12 $2,109.12 7 Deduct for non-compliance with tie bar spacing, various streets, per ($0.30\ contract documents 50,296.00 50,296.00 ($15,088.80) ADDITIONAL WORK: C.O. # 2 - (ITEMS 1 - 7) - SUB-TOTAL $12,991.72 ($362,057.29) ($15,088.80) NET DECREASE TO SECTION I - SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 48. Furnish and install approx. 5 linear feet of 6" Storm Sewer, complete as specified, per linear foot 5.00 27.00 22.00 $30.00 $660.00 49. Furnish and install approx. 6 linear feet of 8" Storm Sewer, complete as specified, per linear foot 6.00 121.50 115.50 $58.00 $6,699.00 Page 5 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 50. Furnish and install approx. 3,093 linear feet of 12" Storm Sewer, complete as specified, per linear foot , 3,093.00 3,138.07 45.07 $33.73 $1,520.21 51. Furnish and install approx. 621 linear feet of 15" Storm Sewer, complete as specified, per linear foot '($5,035.84) 621.00 463.63 -157.37 $32.00 52. Furnish and install approx. 301 linear feet of 18" Storm Sewer, complete as specified, per linear foot ($9,857.75' 301.00 0.00 -301.00 $32.75 53. Furnish and install approx. 313 linear feet of 18" Storm Sewer Relay, complete as specified, per linear foot 313.00 314.63 1.63 $47.50 $77.42 54. Furnish and install approx. 20 linear feet of 20" Storm Sewer, complete as specified, per linear foot 20.00 21.00 1.00 $80.25 $80.25 55. Furnish and install approx. 298 linear feet of 21 "Storm Sewer, complete. as specified, per Jinéàr foot 298.00 0.00 -298.00 $37.95 ($11,309.10) 56. Furnish and install approx. 451 linear feet of 19" x 30" HERCP Class HE-III Storm Sewer, complete as specified, per linear foot 451.00 597.63 146.63 $63.30 $9,281.68 57. Furnish and install approx. 380 linear feet of 43" x 68" HERCP Class HE-III Storm Sewer, complete as specified, per linear foot ,'.. 380.00 376.50 -3.50 $145.00 ($507.50) 58. Furnish and install approx. one (1) 43" x 68" HERCP Class HE-III 45 degree Bend, complete as specified, each 1.00 1.00 $3,185.00 59. Furnish and install approx. one (1) 43" x 68" HERCP Class HE-III 60 degree Bend, complete as specified, each 1.00 1.00 $3,185.00 Page 6 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 60. Furnish and install approx. 140 linear feet of 36" x 58 1/2" RCAP Class A-III Storm Sewer, complete as specified, per linear foot 140.00 130.00 -10.00 $131.15 ($1,311.50) 61. Furnish and install approx. four (4) std. Inlets (Type 1 with 18" sump) with castings, complete as specified, each 4.00 3.00 -1.00 $950.00 ($950.00) 62. Furnish and install approx. 61 std. Inlets (Type 3 with 18" sump) with castings, complete as specified, each 61.00 57.00 -4.00 $1,300.00 ($5,200.00) 63. Furnish and install approx. 30.00 vertical feet of std. Storm Manhole (4' Inside Diameter) in eight (8) locations without castings, complete as specified, per vertical foot 30.00 39.29 9.29 $275.00 $2,554.75 64. Furnish and install approx. 37.00 vertical feet of std. Storm Manhole (5' Inside Diameter) in nine (9) locations without castings, complete as specified, per vertical foot 37.00 14.41 -22.59 $460.00 ($10,391.40) 65. Furnish and install approx. 33.00 vertical feet of std. Storm Manhole (6' Inside Diameter) in seven (7) locations without castings, complete as specified, per vertical foot 33.00 31.09 -1.91 $500.00 ($955.00) 66. Furnish and install approx. 11.6 vertical feet of std. Storm Inlet Manhole (4' Inside Diameter) in three (3) locations with casting, complete as specified, per vertical foot , 11.60 10.63 -0.97 $410.00 ($397.70) 67. Furnish and install approx. 40.00 vertical feet of std. Storm Inlet Manhole (6' Inside Diameter) in six (6) locations with casting, complete as specified, per vertical foot 40.00 35.50 -4.50 $525.00 ($2,362.50) Page 7 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 68. Furnish and install approx. 14.6 vertical feet of std. Box Storm Inlet Manhole in two (2) locations, complete as specified, per vertical foot 14.60 12.26 -2.34 $600.00 ($1,404.00) 69. Reconstruct approx. four (4) Storm Manhole, complete as specified, each 4.00 4.00 $900.00 70. Reconstruct approx. three (3) Storm Inlet Manhole, complete as specified, each 3.00 2.00 -1.00 $950.00 ($950.00) 71. Reconstruct approx. six (6) Storm Box Manhole, complete as specified, each 6.00 5.00 -1.00 $2,000.00 ($2,000.00) 72. Rebuild approx. three (3) std. Inlet (Type 3 with 18" sump) with base and casting, complete as specified, each 3.00 3.00 $1,300.00 73. Rebuild approx. 3.72 vertical feet of Storm Inlet Manhole (5' Inside Diameter) in one (1) location'with base, complete as specified, per vertical foot 3.72 2.63 -1.09 $500.00 ($545.00) 74. Rebuild approx. 8.1 vertical feet of Storm Manhole (6' Inside Diameter) in one (1) location with base, complete as specified, per vertical foot 8.10 10.19 2.09 $550.00 $1,149.50 75. Rebuild approx. 12.75 vertical feet of Storm Box Inlet Manhole in two (2) locations, with base, complete as specified, per vertical foot 12.75 11.75 -1.00 $685.00 ($685.00) 76. Furnish and install approx. 106 6" Storm Laterals, complete as specified, each 106.00 103.00 -3.00 $800.00 ($2,400.00) 77. Furnish and install approx. two (2) Neenah R-3067-C Inlet casting w/diagonal grate, complete as specified, each 2.00 2.00 $425.00 Page 8 CONTRACT: 04-07 CHANGE ORDER # 2 CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 78. Abandon approx. 42 Inlets or Manholes, complete as specified, each 42.00 42.00 $200.00 79. Abandon existing 40" x 60" concrete Box Culvert Storm Sewer on Georgia Street, complete as specified, lump sum 1.00 1.00 $9,500.00 80. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION 11- (BID ITEMS 48 - 80) - SUB-TOTALS $22,022.81 ($56,262.29) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Additional stone backfill under new storm on Rugby St., lump sum, 6/8/04 1.00 1.00 $413.25 $413.25 2 Provide ductile iron storm lead in lieu of PVC storm at Georgia St. and W. 11th Ave., lump sum, 6/11/04 1.00 1.00 $640.15 $640.15 3 Provide three (3) steel plates for top of shallow storm manholes on Osborn ' Ave., 7/1/04 3.00 3.00 $690.00 $2,070.00 4 Provide two (2) steel plates for top of shallow box storm manholes in South Park, 7/1/04 2.00 2.00 $1,480.00 $2,960.00 5 Additional cost for different size storm manhole adjustment than anticipated on Shore Preserve Dr. and Wood Duck Ct., lump sum, 7/8/05 1.00 1.00 $787.50 $787.50 6 Repairdamaged 12" storm sewer on Shore Preserve Drive, Lot 22, lump sum, 7/13/04 1.00 1.00 $560.88 $560.88 7 Abandon bad piece of storm sewer from inlet at 2325 Shore Preserve Dr., lump sum, 7/13/04 1.00 1.00 $125.00 $125.00 Page 9 CONTRACT: 04-07 CHANGE ORDER # 2 CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 8 Cost to abandon proposed storm sewer trench on Street "B", grade conflict necessitated change in design, lump sum, 9/10/04 1.00 1.00 $1,406.00 $1,406.00 9 Construct box storm manhole over 36" x 58" storm sewer at W. 17th Ave. and Minnesota St., MH #M13, lump sum, 9/17/04 1.00 1.00 $2,520.00 $2,520.00 10 Move inlet at SW corner of Osborn Ave. and Georgia St., lump sum, 7/21/04 1.00 1.00 $1,474.00 $1,474.00 11 Relay 15 ft. of 30" storm sewer, modify MH #N15 and install concrete collar on 30" storm sewer to allow proposed 8" sanitary sewer relay at Central St. (S.) and W. Nevada Ave., lump sum,7/8/04 1.00 1.00 $1,912.50 $1,912.50 12 Bulkhead existing 12" storm sewer into MN #N4 on W. Nevada Ave., lump sum, 7/14/04 1.00 1.00 $400.00 $400.00 13 Provide steel plate for adjusting MH #A 13 on Ashland St. and E. Murdock Ave., lump sum, 10/11/04 1.00 1.00 $680.00 $680.00 ADDITIONAL WORK: C.O. # 2 - (ITEMS 1 - 13) - SUB-TOTAL $15,949.28 $0.00 NET INCREASE TO SECTION II - ($18,290.20) SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES' QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 81. Furnish and install approx. 3,425 linear feet of 8" Sanitary Sewer (Relay/New), complete as specified, per linear foot 3,425.00 3,028.39 -396.61 $50.73 ($20,120.03) 82. Furnish and install approx. 2,375 linear feet of 10" Sanitary Sewer Relay, complete as specified, per linear foot 2,375.00 2,371.85 -3.15 $51.00 ($160.65) Page 1 0 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 83. Furnish and install aþprox. 1,300 linear feet of 18" Sanitary Sewer Relay (W. 17th Avenue), complete as specified, per linear foot 1,300.00 1,289.48 -10.52 $96.45 ($1,014.65) 84. Furnish and install approx. 4.0 vertical feet of 8" , Sanitary Sewer Drop, complete as specified, per vertical foot 4.00 3.71 -0.29 $250.00 ($72.50) 85. Fumish and install approx. 3.0 vertical feet of 12" Sanitary Sewer Drop, complete as specified, per vertical foot 3.00 2.58 -0.42 $500.00 ($210.00) 86. Furnish and install apPfOX. 283.0 vertical feet of std. Sanitary Manhole (4' Inside Diameter) in 35 locations, complete as specified, without casting, per vertical foot 283.00 252.92 -30.08 $160.00 ($4,812.80) 87. Reconstruct approx. four (4) Sanitary Manholes, " - complete as specified, each 4.00 4.00 $800.00 88. Reconnect approx. 28 Sanitary Laterals, complete as specified, each 28.00 30.00 2.00 $300.00 $600.00 89. Furnish and install approx. 2,575 linear feet of 6" Sanitary Lateral Relay, complete as specified, per linear foot 2,575.00 2,229.07 -345.93 $41.00 ($14,183.13) 90. Abandon approx. eight (8) Sanitary Manholes, complete as specified, each 8.00 8.00 $350.00 91. Provide $375.00 to the City of Oshkosh for project management communications, complete . as specified, lump sum ",- 1.00 1.00 $375.00 SECTION 111- (BID ITEMS 81 - 91) - SUB-TOTALS $600.00 ($40,573.76) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III Page 11 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANT/TIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Manhole modifications on MH # 6 at Georgia St. and W. 11th Ave., lump sum, 5/18/04 1.00 1.00 $1,989.69 $1,989.69 2 Core sanitary manhole at Georgia St. and W. 12th Ave. to raise connection to west due to water main conflict, lump sum, 5/27/04 1.00 1.00 $850.00 $850.00 3 Extra costs to construct MH # 2 at Huron Ave. and Mt. Vernon St. due to unknown water stub and angle of incoming sewers, lump sum. 8/12/04 1.00 1.00 $1,353.50 $1,353.50 4 Provide temporary 8" and 12" sanitary piping while installing new sanitary on W. Nevada Ave. at Central St. (S), lump sum, 7/2/04 1.00 1.00 $846.15 $846.15 5 Abandon service connections to 13 and 23 W. Nevada Ave. due to change in design and keep existing 8" sanitary in south terrace active, lump sum, 7/7/04 1.00 1.00 $1,300.00 $1,300.00 6 Abandon newly installed lateral to 27 W. Nevada Ave. and reconnect to existing 8" sanitary in south terrace after change in design, lump sum, 7/8/04 1.00 1.00 $930.50 $930.50 7 Core new connection into new MHs # 24 & 25 on W. Nevada Ave. at Central St. (N), lump sum, 7/16/04 1.00 1.00 $660.00 $660.00 8 Rock removal on W. 17th Ave. from Oregon St. to Minnesota St. (642.30 c.y.), lump sum, 8/18/04 - 8/31/04 1.00 1.00 $54,446.02 $54,446.02 9 Dig three (3) test holes on W. 17th Ave. to determine rock depths, lump sum, 8/19/04 1.00 1.00 $234.80 $234.80 Page 12 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 10 Modifications to sanitary '". MH # 18 at W. 17th Ave. and Minnesota St. due to, different invert elevations, lump sum, 8/31/04 1.00 1.00 $523.80 $523.80 11 Extra costs to move sanitary MH # 22 at Minnesota St. and W. 18th Ave. to west after existing sanitary lateral was identified, lump sum, 9/10/04 1.00 1.00 $1,518.50 $1,518.50 ADDITIONAL WORK: C. O. # 2 - (ITEMS 1 -11) - SUB-TOTAL $64,652.96 $0.00 NET INCREASE TO SECTION III - $24,679.20 SECTION IV - WATER MAIN ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 92. Furnish and install approx. 70 linear feet of 4" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 70.00 25.50 -44.50 $90.00 ($4,005.00) 93. Furnish and install approx. 590 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 590.00 433.00 -157.00 $70.00 ($10,990.00) 94. Furnish and install approx. 5,075 linear feet of 8" Ductile Iron Water Main w/poly wrap, complete as specified, (fittings not included), per linear foot 5,075.00 4,300.00 -775.00 $53.98 ($41,834.50) 95. No Bid Item 96. No Bid Item 97. Reconnect approx. three (3), 1" Water Services, complete as specified, each 3.00 0.00 -3.00 $400.00 ($1,200.00) Page 13 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 98. Furnish and install approx. .' 1,725 linear feet of 1" Water Service (Relay/New), complete as specified, not including corporation and stop box, per linear foot 1,725.00 1,773.00 48.00 $30.00 $1,440.00 99. Furnish and install approx. 52 linear feet of 2" New Water Service, complete as specified, not including corporation and stop box, per linear foot 52.00 60.00 8.00 $40.00 $320.00 100. Furnish and install approx. 56, 1" corporation and stop box with rod, complete as specified, each 56.00 84.00 28.00 $250.00 $7,000.00 101. Furnish and install approx. two (2), 2" corporation and stop box with rod, complete as specified, each 2.00 2.00 $500.00 102. Furnish and install approx. five (5), 6" plug, complete as specified, each 5.00 3.00 -2.00 $65.00 ($130.00) 103. Furnish and install approx. four (4), 8" plug, complete as specified, each 4.00 1.00 -3.00 $76.00 ($228.00) 104. No Bid Item 105. No Bid Item 106. Furnish and install approx. three (3), 6" x 6" Tees, complete as specified, each 3.00 3.00 $225.00 107. Furnish and install approx. one (1), 8"x4"Tee, complete as specified, each 1.00 1.00 $240.00 108. Furnish and install approx. 23, 8" x 6" Tees, complete as specified, each 23.00 17.00 -6.00 $225.00 ($1,350.00) 109. Furnish and install approx. four (4), 8" x 8" Tees, complete as specified, each 4.00 2.00 -2.00 $240.00 ($480.00) 110. No Bid Item 111. Furnish and install approx. one (1), 6" x 4" Reducer, complete as specified, each 1.00 1.00 $145.00 Page 14 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 112. Furnish and install approx. eight (8), 8" x 6" Reducers, complete as specified, each 8.00 11.00 3.00 $125.00 $375.00 113. Furnish and install approx. one (1),16" x 8" Reducer, complete as specified, each 1.00 0.00 -1.00 $445.00 ($445.00) 114. No Bid Item 115. Furnish and install approx. ten (10), 4" - 45 degree Bends, complete as specified, each 10.00 6.00 -4.00 $140.00 ($560.00) 116. Furnish and install approx. 14, 6" - 45 degree Bends, complete as specified, each 14.00 17.00 3.00 $160.00 $480.00 117. Furnish and install approx. 12, 8" - 45 degree Bends, complete as specified, each 12.00 8.00 -4.00 $190.00 ($760.00) 118. No Bid Item 119. No Bid Item 120. Furnish and install approx. one (1), 4" - 90 degree Bend, complete as specified, each 1.00 1.00 $130.00 121. No Bid Item 122. Furnish and install approx. one (1). 8" - 90 degree Bend, complete as specified, each 1.00 1.00 $220.00 123. Furnish and install approx. one (1), 4" Valve, complete as specified, each 1.00 2.00 1.00 $530.00 $530.00 124. Furnish and install approx. 27, 6" Valves, complete as specified, each 27.00 21.00 -6.00 $575.00 ($3,450.00) 125. Furnish and install approx. 16, 8" Valves, complete as specified, each 16.00 16.00 $755.00 126. No Bid Item 127. No Bid Item 128. Furnish and install approx. one (1), 8" x 4" Tapping Valve and Sleeve, complete as specified, each 1.00 0.00 -1.00 $1,560.00 ($1,560.00) Page 15 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 129. Furnish and install approx. one (1), 8" x 8" Tapping Valves and Sleeves, complete as specified, each 1.00 1.00 $1,615.00 130. Furnish and install approx. four (4), 12" x 8" Tapping Valves and Sleeves, complete as specified, each 4.00 3.00 -1.00 $1,975.00 ($1,975.00) 131. Furnish and install approx. one (1),12" x 4" Tapping Valve and Sleeve, complete as specified, each 1.00 1.00 $1,725.00 132. Furnish and install approx. three (3), 12" x 6" Tapping Valves and Sleeves, complete as specified, each 3.00 4.00 1.00 $1,755.00 $1,755.00 133. Furnish and install approx. 19 Hydrants, complete as specified, each 19.00 17.00 -2.00 $1,650.00 ($3,300.00) 134. Lower 12" Water Main at W. 12th Avenue and GeorQia Street, lump sum 1.QO 1.00 $5,000.00 135. Abandon 6" Water Main on Ashland Street, complete as specified, lump sum 1.00 1.00 $2,100.00 136. Abandon 6" Water Main on Church Avenue, complete as specified, lump sum 1.00 1.00 $1,300.00 137. Abandon 6" Water Main on Georgia Street, complete as specified, lump sum 1.00 1.00 $2,000.00 138. Abandon 6" Water Main on Minnesota Street, complete as specified, lump sum 1.00 1.00 $3,000.00 139. Abandon 6" Water Main on W. Nevada Avenue, complete as specified, lump sum 1.00 1.00 $7,000.00 140. Abandon 6" Water Main on Osborn Avenue, complete as specified, lump sum 1.00 1.00 $2,000.00 141. No Bid Item Page 16 CONTRACT: 04-07 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES /QUANTITIES INCREASE DECREASE UNIT CONTRACT/ CONTRACT PRICE PRICE 142. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION IV - (BID ITEMS 92 - 142) - SUB-TOTALS $11,900.00 ($72,267.50) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Assist City Water Dept. in shutting down existing 12" main on Georgia St. and W. 11th Ave., lump sum, 5/19/04 1.00 1.00 $2,250.00 $2,250.00 2 Remove approx. 23.57 c.y. of rock on Osborn Ave. for water main, per c.y., 5/24/04 23.57 23.57 $127.00 $2,993.39 3 Tie in existing 16" main to new 8" water at Georgia St. and Osborn Ave., lump sum, 5/26/04 1.00 1.00 $2,786.00 $2,786.00 4 Provide extra gravel for water main along Georgia St. due to extra depth of water main, lump sum, 6/1/04 1.00 1.00 $336.00 $336.00 5 Repair abandoned 4" water stub at Osborn Ave. and Rugby St., lump sum, 6/4/04 1.00 1.00 $525.00 $525.00 6 Repair existing 6" water main on Osborn Ave. which veered into sanitary seINer relay trench, lump sum, 6/8/04 1.00 1.00 $974.75 $974.75 7 Assisted City Water Dept. in shutting down existing 6" water on E. Nevada Ave., lump sum, 7/15/04 1.00 1.00 $1,800.00 $1,800.00 8 Reconnect existing 6" water north ofW. Murdock Ave. at Ashland St. per Jim Wolf, City Water Dept., lump sum, 8/11/04 1.00 1.00 $474.50 $474.50 Page 17 CONTRACT: 04-07 CHANGE ORDER # 2 CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 9 Raise existing 6" water main on W. Nevada Ave. and Central St. (N.) to accommodate new 8" sanitary sewer, lump sum, 6/23/04 1.00 1.00 / $2,610.00 $2,610.00 10 Relay existing 2" water service to school field on W. Nevada Ave. west of Kentucky St. (S.), lump sum, 7/9/04 1.00 1.00 $1,380.00 $1,380.00 11 Install salvaged hydrant at W. Nevada Ave. and Kentucky St. (N.), lump sum, 7/12/04 1.00 1.00 $400.00 $400.00 12 Extra time to locate unknown valves and shut down existing water main on W. Nevada Ave., lump sum, 7/15/04 1.00 1.00 $2,000.00 $2,000.00 13 Repair broken water valve box on Isaac Lane at Sta, 2+40, lump sum, 7/20/04 1.00 1.00 $240.00 $240.00 14 Repair broken water valve box on Shore Preserve Dr., lump sum, 7/22/04 1.00 1.00 $372.75 $372.75 15 Repair broken water valve box on Isaac Lane and Jacob Ave., lump sum, 7/23/04 1.00 1.00 $213.00 $213.00 16 Repair 5 broken water valve boxes on Shore Preserve Dr., lump sum, 7/30/04 1.00 1.00 $1,125.00 $1,125.00 17 Repair broken water valve box on Shore Preserve Dr., lump sum, 10/18/04 1.00 1.00 $510.00 $510.00 NET DECREASE TO SECTION IV . $20,990.39 ($39,377.11 ) $0.00 ADDITIONAL WORK: C.O. # 2 (ITEMS 1 .17) - SUB-TOTAL NET INCREASE TO SECTIONS I, II, III, IV NET DECREASE TO SECTIONS I, II, III, IV $144,526.88 ($539,572.28) NET DECREASE TO CONTRACT: ($395,045.40) Page 18