Loading...
HomeMy WebLinkAbout0113251 B No113251 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER STEVEN/PATRICIA OWEN Job Address159 W 18TH AVEOwnerCreate Date04/01/2005 DesignerContractorZILLGES EXCAVATING Category161 - Wrecking Residential DwellingsPlan TypeBuildingSignCanopyFenceRaze ZoningClass of Const:VBSize Sq. Ft.Projection Unfinished/Basement0Rooms0Height0Ft. Finished/Living 0Sq. Ft.Bedrooms0StoriesCanopies0 Garage0Sq. Ft.Baths0Signs0 Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitNot RequiredFlood PlainNoHeight PermitNot Required Park DedicationNot Required# Dwelling Units0# Structures0 SFR/ RAZE - existing single family home. All material is to be properly disposed of, and required DNR notification provided prior to begining Use/Nature demolition of structure. of Work HVAC ContractorPlumbing Contractor Electric Contractor Fees: Valuation$5,000.00Plan Approval$0.00Permit Fee Paid$44.00Park Dedication$0.00 04/01/200500/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id #1401390000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. SignatureDate Agent/Owner 1800 FOUNTAIN AVEOSHKOSHWI549040000920-231-1994 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.