Loading...
HomeMy WebLinkAbout0113296 B e OSHKOSH ON THE WATER Job Address 333 N LARK ST CITY OF OSHKOSH No 113296 BUILDING PERMIT - APPLICATION AND RECORD Owner MARC D/MELISSA KIENAST Create Date 04/05/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work SFR/ LATE PERMIT/ Constructed a bathroom in the basement. The minimum ceiling height shall be 6' - 6". An exhaust fan shall be provided and be vented to the exterior of the building. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $800.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 04/05/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1609890000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 333 N LARK ST Agent/Owner OSHKOSH WI 54902 - 4235 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. Î'- .....,"~. fk¡jV~'" Q .f\ ./