Loading...
HomeMy WebLinkAbout0113254-Building e OSHKOSH ON THE WATER Job Address 2211 OREGON ST CITY OF OSHKOSH No 113254 BUILDING PERMIT - APPLICATION AND RECORD Owner COYOTE OF WISCONSIN LLC Create Date 03/24/2005 Designer Contractor STORECRAFTERSINC Category 232 - Alteration Stores & Customer Service Plan 01-13-0305-B Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Suite 'Z' - Interior alterations for confrence room Use/Nature of Work HVAC Contractor GARTMAN MECHANICAL SERVICES Plumbing Contractor Electric Contractor TOWN & COUNTRY ELECTRIC Fees: Valuation $13,110.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Issued By: Date 04/01/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1410280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 100 BOXART STREET Agent/Owner ROCHESTER NY 14612 - 0000 Telephone Number 585-865-5350 ext 1Of To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.