Loading...
HomeMy WebLinkAbout0113144-Building (siding/windows) e OSHKOSH ON THE WATER Job Address 1412 OREGON ST CITY OF OSHKOSH No 113144 BUILDING PERMIT - APPLICATION AND RECORD Owner CARL G RADDATZ Create Date 03/21/2005 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ LATE PERMIT/ Installation of new vinyl siding, replace 12 windows - same size and location, cover soffitt & Fascia, wrap windows. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,850.00 Plan Approval $0.00 Permit Fee Paid $174.00 Park Dedication $0.00 Issued By: Date 03/23/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0304330000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 Agent/Owner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.