Loading...
HomeMy WebLinkAbout0113111-Building (2nd fl) e OSHKOSH ON THE WATER Job Address 424 MERRITT AVE CITY OF OSHKOSH No 113111 BUILDING PERMIT - APPLICATION AND RECORD Owner COREY M DOMKE Create Date 03/21/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: VB Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 SFR/ Remove lath and plaster, install new insulation and drywall in 2 upstairs bedrooms, and stairwell. NO STRUCTURAL CHANGES - This permit does not include any electrical work. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 03/21/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0404430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.