HomeMy WebLinkAbout0113111-Building (2nd fl)
e
OSHKOSH
ON THE WATER
Job Address 424 MERRITT AVE
CITY OF OSHKOSH
No
113111
BUILDING PERMIT - APPLICATION AND RECORD
Owner
COREY M DOMKE
Create Date
03/21/2005
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
VB
Size
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
SFR/ Remove lath and plaster, install new insulation and drywall in 2 upstairs bedrooms, and stairwell. NO STRUCTURAL CHANGES - This
permit does not include any electrical work.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 03/21/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 0404430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
Agent/Owner
Oshkosh
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.