Loading...
HomeMy WebLinkAbout0113167-Building e OSHKOSH ON THE WATER Job Address 1724 SKYVIEW AVE CITY OF OSHKOSH No 113167 BUILDING PERMIT - APPLICATION AND RECORD Owner CHRIS R/DANNA L CARPENTER Create Date 03/24/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Abandoning the existing bathroom in the basement. Creating a new bathroom in part of the existing finished off basement. A finished ceiling height of 83" will be provided. NOTE: This ceiling height is allow under the City of Oshkosh Municipal Code due to the house being built in 1965. No smoke detection system required due to the bathroom not being habitable space. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 03/24/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0612430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1724 SKYVIEW AVE Agent/Owner OSHKOSH WI 54902 - ~ Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. - tX) CD ~! \~~ ~ ~ , ...~~ °:y:: (t) ~ ~\ \ h~ - if"'~ - \\~y ~ ~ ~ .7 \~ 1- ~ (Y) .~ tJG - - - )4jw~ 'W ~~I,~ D - Q ~~~ \n] 1 3~ ~ ~ ðI .~ <::¥ a r'J; - ~ N) -- 0<:) - ~~ - ....... <.-/ :z .~ ---.., ......-' x 8J ':::J (Û _C "-