Loading...
HomeMy WebLinkAbout0113172-Building e OSHKOSH ON THE WATER Job Address 113 E NEW YORKAVE CITY OF OSHKOSH No 113172 BUILDING PERMIT - APPLICATION AND RECORD Owner CHERIE E VIENOLA Create Date 03/24/2005 Designer Contractor LM SMITH CO Category 140 - Interior Remodeling Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Remodeling the kitchen. Installation of new insulation, drywall, and cabinets. NO WALLS WILL BE MOVED. Use/Nature of Work HVAC Contractor Plumbing Contractor THE PLUMBERS Electric Contractor DILLMAN-SEIDL ELECTRIC LLC Fees: Valuation $9,000.00 Plan Approval $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Issued By: Date 03/24/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1003610000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address W 6527 LINCOLN RD Agent/Owner VAN DYNE WI 54979 - 0000 Telephone Number 922-2700 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.