Loading...
HomeMy WebLinkAbout0113087 B e OSHKOSH ON THE WATER Job Address 421 LINDE ST CITY OF OSHKOSH No 113087 BUILDING PERMIT - APPLICATION AND RECORD Owner RUSSELL G/AMY J SALZER Create Date 01/05/2005 Designer Contractor LAIB RESTORATION INC Category 140 - Interior Remodeling Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Remodeling the EXISTING 3rd story and adding a dormer. All work shall comply with applicable codes and all loads shall be properly ransferred. Use/Nature of Work HVAC Contractor GARTMAN MECHANICAL SERVICES Plumbing Contractor Electric Contractor WITZKE ELECTRIC INC Fees: Valuation $18,000.00 Plan Approval $0.00 Permit Fee Paid $114.00 Park Dedication $0.00 Issued By: Date 03/21/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1101420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 21 W NEW YORK AVE Agent/Owner OSHKOSH WI 54901 - 3757 Telephone Number 233-7026 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.