Loading...
HomeMy WebLinkAbout2005-Plumbing CITY OF OSHKOSH 113061 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address837 WOODLAND AVEOwnerBOARD OF REGENTS UNIV OF WIS SYSCreate Date03/16/2005 ContractorJIM'S PLUMBING & HEATING INCCategoryPlan 410 - Residential-Interior 0 Water Softner0 Bathtub1Shower0Wait. St.0Shamp Sink0Coffee Maker Local Waste00 Whirlpool0Floor Drain0Ice Chest0Flr/Wst Sink0 Int Grease Trap Clothes Wshr1 Lavatory21Exam Sink0Catch Basin00 Lndry TrayExt Grease Trap Bidet0 Toilet20Wash Ftn0 0Sculry Sink DisposalRPZ Valve0 Res. Sink1Beer Tap00Urinal0 1 Hand Sink Dishwasher 0 Eye Wash Statn Bar Sink0 0Lab Sink00Standp Rec0 Sump PumpPlaster Sink Water Heater1 0Sterilizer00Ice Maker0 Classrm SinkSurgeons Sink Site Drain0 0 Breakrm SinkDip Well0F Prep Sink0Gar Drain0 Roof Drain0 Drink Ftn0Serv Sink00 Ejector/Grind0Soda Disp Use/Nature of Work REMODELING FOR RE-HAB PROJECT SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 Parcel Id # 0 0505620000 $0.00Permit Voided Valuation$8,000.00Plan ApprovalPermit Fees$70.00 Issued ByDate03/16/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressW6166 GREENVILLE DRGREENVILLEWI54942-0000Telephone Number920-757-5258 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.