Loading...
HomeMy WebLinkAbout2005-Building e OSHKOSH ON THE WATER Job Address 2059-2087 WITZEL AVE CITY OF OSHKOSH No 113037 BUILDING PERMIT - APPLICATION AND RECORD Owner WITZEL ST RETAIL LLC Create Date 03/15/2005 Designer Contractor R J ALBRIGHT INC. Category 231 - Addition Stores & Customer Service Plan N9-11-0305B Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: 2B Size 2500 sq ft Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 2087 Witzel/Interior build out for "Game STop" as per plans approved. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $27,500.00 Plan Approval $0.00 Permit Fee Paid $148.00 Park Dedication $0.00 Issued By: Date 03/15/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0616030100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 5711 GREEN VALLEY RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.