Loading...
HomeMy WebLinkAbout0113038-Building (shed) e OSHKOSH ON THE WATER Job Address 1015 TAFT AVE CITY OF OSHKOSH No 113038 BUILDING PERMIT - APPLICATION AND RECORD Owner JERRY A/SHARON LOKER Create Date 03/15/2005 Designer Contractor OWNER Category 151 - New Utility Buildings-Sheds (Residential) Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Placing a 6' x 6' shed in the rear yard. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $400.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 03/15/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1606300000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1015 TAFT AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: IO~ """\0...4 PROPERTY OWNER/CONTRACTOR: ¿ok.,... CONSTRUCTION DATA: 0 New Construction 0 Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) ZONING: 0 Alteration (,'x:'" .rlJ COMPLIANCE CHECKLIST :$ 400 DEFICIENT DEFICIENT 0 Use 0 Lot Width 0 Lot Area 0 Lot Area Per Family 0 Flood Plain 0 Front Yard 0 Front Yard Side Street 0 RearYard 0 Side Yards 0 Building Area 0 Parking Standards 0 Off-Street Loading Standards 0 Vision Clearance 0 Transitional Yard Standards COMMENTS: DEFICIENT 0 Landscape Standards 0 Height 0 Conditions of Approval 0 Compliance with P.C. or BZA Conditions of Approval 0 Signage Standards 0 Mechanical Equip. Screening 0 Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. J8J APPROVED Plan Commission Action Required 0 DENIED Variance(s) Required REVIEWED BY: ):t- DATE: 3-ls-or 2003 1021 5 b 0 N ~ 1015 1011 b 0 N 50.0' .0' ~ OjJi~QfH City of Oshkosh Community Development 1015 Taft Ave. 10 15 Feet ~ Scale: 1" = 20' N A DISCLAIMER Thb -" "".."..."" """d~..,, .w.."ud""',"'.""""""U- Th" "',,"...."mø..., ""'-"'" "d'or'm.""=""",ri'm.~",,,~ ud"'."mud""u-"""" ",-,"ow..".""""""""""," ."""u,.,. T"CI~,r""""h"oo". ...'"., """,Ioo=""u"""""""" If~."""",u",r~...ø_",".ih' CI""""..... March 15, 2005 By: IN Source: City of Oshkosh GIS