HomeMy WebLinkAbout0112999-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 2005 VINLAND ST
CITY OF OSHKOSH
No
112999
BUILDING PERMIT - APPLICATION AND RECORD
Owner
VIVIAN G HEANEY
Create Date
03/14/2005
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
0
# Structures
0
SFR/ Replace 3 windows in existing openings.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00
Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 03/14/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1215810000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1224W SOUTH PARK AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.