Loading...
HomeMy WebLinkAbout2005-Building (alterations) e OSHKOSH ON THE WATER Job Address 3001 S WASHBURN ST CITY OF OSHKOSH No 112993 BUILDING PERMIT - APPLICATION AND RECORD Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 03/09/2005 Designer Larson Meyer Contractor STORECRAFTERSINC Category 232 - Alteration Stores & Customer Service Plan 01-12-0305-B Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: IIIB Size 25000 sq ft Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 COMM/ Interior alterations as per State Transaction ID # 1111934 to convert former food court area into store for "Vanity Fair" Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $219,000.00 Plan Approval $0.00 Permit Fee Paid $721.00 Park Dedication $0.00 Issued By: Date 03/11/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 100 BOXART STREET Agent/Owner ROCHESTER NY 14612 - 0000 Telephone Number 585-865-5350 ext 1Of To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.