HomeMy WebLinkAbout2005-Building (alterations)
e
OSHKOSH
ON THE WATER
Job Address 3001 S WASHBURN ST
CITY OF OSHKOSH
No
112993
BUILDING PERMIT - APPLICATION AND RECORD
Owner
FIRST HORIZON GROUP LIMITED PTNSHP
Create Date
03/09/2005
Designer
Larson Meyer
Contractor
STORECRAFTERSINC
Category
232 - Alteration Stores & Customer Service
Plan 01-12-0305-B
Type
I. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
IIIB
Size 25000 sq ft
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
COMM/ Interior alterations as per State Transaction ID # 1111934 to convert former food court area into store for "Vanity Fair"
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$219,000.00
Plan Approval
$0.00 Permit Fee Paid
$721.00 Park Dedication
$0.00
Issued By:
Date 03/11/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1329420000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
100 BOXART STREET
Agent/Owner
ROCHESTER
NY 14612 - 0000 Telephone Number
585-865-5350 ext 1Of
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.