Loading...
HomeMy WebLinkAbout2005-Building e OSHKOSH ON THE WATER Job Address 837 WOODLAND AVE CITY OF OSHKOSH No 113002 BUILDING PERMIT - APPLICATION AND RECORD Owner BOARD OF REGENTS UNIV OF WIS SYS Create Date 03/14/2005 Designer Contractor A-AEXTERIORS.COM INC Category 141 - Exterior Remodeling Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work SFR/ REHAB/ Remodeling the interior and exterior of the building including windows storm doors, siding the house and garage reroofing the garage, handrails, drywall/ plaster repair and foundation tuckpointing. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $60,000.00 Plan Approval $0.00 Permit Fee Paid $244.00 Park Dedication $0.00 Issued By: Date 03/14/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0505620000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 6897 CLOW RD Agent/Owner WINNECONNE WI 54986 - 0000 Telephone Number 920-582-4320 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.