HomeMy WebLinkAbout0112978-Building (roof & kitchen/bath remodel)
e
OSHKOSH
ON THE WATER
Job Address 1015EIRVINGAVE
CITY OF OSHKOSH
No
112978
BUILDING PERMIT - APPLICATION AND RECORD
Owner
SCOTT C N BRAYTON/NICOLE L SHA
Create Date
03/02/2005
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
0
# Structures
0
SFR/ LATE PERMIT/ Previous owner Scott Brayton was responsible for remodeling prior to 3-1-2005. Roof was replaced by "The Concrete
Guy" aka. Kyle Erdman. The previous owner was responsible for the kitchen remodel. The 2nd floor bathroom was an existi ng closet.
Seperate permits will be required to be obtained by a Plumber and an Electrician.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
UNKNOWN????
Fees: Valuation
$11,500.00
Plan Approval
$0.00 Permit Fee Paid
$184.00 Park Dedication
$0.00
Issued By:
Date 03/11/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 11 04300000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1015 E IRVING AVE
Agent/Owner
OSHKOSH
WI 54901 - 4615 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.