Loading...
HomeMy WebLinkAbout0112955-Building (foundation anchors) e OSHKOSH ON THE WATER Job Address 1619 CENTRAL ST CITY OF OSHKOSH No 112955 BUILDING PERMIT - APPLICATION AND RECORD Owner STEPHEN C NEYHARD/L YNN SAMUEL Create Date 03/09/2005 Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 SFR/ Install 5 earth anchors on front (East) side of house, to anchor foundation Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,900.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 03/09/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1502090000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 754 W AIRPORT RD Agent/Owner MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.