Loading...
HomeMy WebLinkAbout0112964 P CITY OF OSHKOSH 112964 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address2360 PATRIOT LNOwnerWESTOWNE HEIGHTSCreate Date08/15/2002 ContractorWATTERS PLUMBINGCategoryPlanD2-52-0802-P 430 - Industrial-Exterior (laterals) 0 Water Softner0 Bathtub0Shower0Wait. St.0Shamp Sink0Coffee Maker Local Waste00 Whirlpool0Floor Drain0Ice Chest0Flr/Wst Sink0 Int Grease Trap Clothes Wshr0 Lavatory00Exam Sink0Catch Basin00 Lndry TrayExt Grease Trap Bidet0 Toilet00Wash Ftn0 0Sculry Sink DisposalRPZ Valve0 Res. Sink0Beer Tap00Urinal0 0 Hand Sink Dishwasher 0 Eye Wash Statn Bar Sink0 0Lab Sink00Standp Rec0 Sump PumpPlaster Sink Water Heater0 0Sterilizer00Ice Maker0 Classrm SinkSurgeons Sink Site Drain0 0 Breakrm SinkDip Well0F Prep Sink0Gar Drain0 Roof Drain0 Drink Ftn0Serv Sink00 Ejector/Grind0Soda Disp Use/Nature of Work 5 UNIT CONDO SizeMaterialType#Conn. Type Sanitary Sewer0 0 TWN OF ALGOMA0 0 0 Storm SewerPlasticLateral0New 0 0 0 0 Water Service2"CopperLateral1New 0 0 0 Parcel Id # 0 $0.00Permit Voided Valuation$1,000.00Plan ApprovalPermit Fees$50.00 Issued ByDate03/09/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner AddressPO BOX 118MENASHAWI54952-0118Telephone Number920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.