PURPOSE:
AWARD BID I REFUSE ENCLOSURE
INITIATED BY:
DEPARTMENT OF COMMUNITY DEVELOPMENT
WHEREAS, the City of Oshkosh has heretofore advertised for bids for
construction of refuse enclosures in the Algoma Parking Lot and the Division Street
Parking Lot; and
WHEREAS, upon the opening and tabulation of bids, it appears funds are not
available for construction of both sites and it is recommended that the Algoma Parking
Lot site be undertaken at this time and the following is the most advantageous bid:
RJM CONSTRUCTION
509 E. BURDICK STREET
BLACK CREEK, WI 54106
$ 22,900.00 original bid
4,000.00 additional mobilization cost
$ 26,900.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from Acct. No. 209-1030-7206-00000 Business Improvement District.
BID OPENING
REFUSE ENCLOSURES: Algoma Parking Lot & Division Street Parking Lot
February 3, 2005
Contractor Algorna Parking Lot/100 Division Street Parking Alternate Bid: Install
Block of Algorna Blvd, Lot, 400 Block of Division gates at existing
adjacent to Water City Grill Street, adjacent to 420 enclosure
Division Street
RJM Construction $22,900 $24,950 $5,500
509 E. Burdick St
Black Creek, WI 54106
IEI General Contractors $34,270 $38,350 $6,470
1725 Midway Rd.
DePere, WI 54115
RJ Albright, Inc. $37,271 $7,785 $36,970
5711 Green Valley Rd
Oshkosh, WI 54904
Fluor Bros Const. Co, Inc. $46,400 $48,200 $10,200
203 Otter Ave.
Oshkosh, WI 54901
Fox Cities Construction $30,445 $31,262 $6,304
4614 Red Fox Rd.
Oshkosh, WI 54904
Hardy Geo-Tech, Inc. $36,800 $41,526 $8,930
952 Willow St.
Omro, WI 54963
R.J M CONSTRUCTION u.c
March 3, 2005
City of Oshkosh
Attn: Kñsty
509 East Buroick Street. Black Creek WI' 54106
Phone: (920) 984-3103' Fax: (920) 984-3103
www.rjmconstructionllc.com
tn the event of the dumpster endosure projed being broken into separate projeds
with separate start dates and only awarding a single location in lieu of ~ entire bid
project, mobilization costs would not be spread equally across an three projects per
the bid. Therefore resulting in a mobilization cost of $4,000.00 to be applied for either
single site increasing our proposal for a single site by this amount.
An option 111m would not increase the prOposed single site contract would be the
deletion of the proposed gates. RJM would build the endosure per spec and plan up
to the installation of the $Winging gate. RJM would have the endosures prepped for
the gate including the tube steel on which the gates will hinge from. If this option is
considered there would be no additional cost added to the original proposal for
mobifization- These gates could be fabricated and installed at the same time as the
second site is completed or at a time that the budget would allow.
Sincerely.
Ryan J. Minfsct1midt
R J M CONSTRUCTfON LLC
':- -. " :,',
, '.., '.. ..,