Loading...
HomeMy WebLinkAbout05-60.doc MARCH 8, 2005 05-60 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO.1 I PUBLIC WORKS CONTRACT 04-13 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: NORTHEAST ASPHALT INC. W6380 DESIGN DR. GREENVILLE WI 54942 Net Increase to contract: $1,136.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Accl. No. 561-2010-1799-00000 - Storm Water Utility - Construction in Progress ,. '" CHANGE ORDER # 1 DATED: February 24,2005 TO: Northeast Asphalt Inc W6380 Design Drive Greenville, WI 54942 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 04-13 , is hereby amended NET INCREASE TO SECTION II - STORM SEWER: $1,136.00 $1,136.00 NET INCREASE TO CONTRACT: CITY OF OSHKOSH BY: City Manager Recommended: ~ \)...;J c..~ Director of Public orks City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney ~, CONTRACT: 04-13 CHANGE ORDER # 1 SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 30. Furnish and install approx. 60 linear feet of 12" RCP Class III Storm Sewer, complete as specified, per ($134.00\ linear foot 60.00 58.00 -2.00 $67.00 31. Furnish and install approx. two (2) Std. type I inlets (30" inside diameter with 18" sump) without castings, complete as specified, each 2.00 2.00 $1,075.00 32. Rebuild approx. four (4) std. type I inlet with base, complete as specified, each 4.00 4.00 $850.00 33. Repair approx. nine (9) std. type I inlet, complete as specified, each 9.00 9.00 $750.00 34. Rebuild approx. two (2) std. storm manhole with base, complete as ' specified, each 2.00 2.00 $2,200.00 35. Core 2' diameter opening in approx. two (2) locations, through top of existing 10" reinforced concrete box culvert, complete as specified, ($1,040.00) each 2.00 -2.00 $520.00 36. Provide $375.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $375.00 SECTION II- (BID ITEMS 30 - 36) - SUB-TOTALS ADDITIONAL WORK ReQUIRED,; C.O. # 1 - SECTION II $0.00 ($1,174.00) ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Furnish and install 6" PVC Storm Sewer, per linear ft. 10.00 10.00 $30.00 $300.00 2 Furnish and install 8" PVC Storm Sewer, per linear ft. 24.00 24.00 $40.00 $960.00 Page 1 ~ 4' CONTRACT: 04-13 CHANGE ORDER # 1 3 Furnish and install Std. Type I Inlet (24" inside diameter) without casting, ' each 1.00 1.00 $1,050.00 $1,050.00 NET INCREASE TO SECTION II - $2,310.00 $1,136.00 $0.00 ADDITIONAL WORK: C.O. # 1 . (ITEMS 1 - 3) . SUB-TOTAL $1,136.00 NET INCREASE TO CONTRACT: Page 2