HomeMy WebLinkAbout05-58.doc MARCH 8, 2005 05-58 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: AWARD BID / ROAD MATERIALS /2005 INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for road materials for 2005; and WHEREAS, upon the opening and tabulation of bids, it appears that the following are the most advantageous bids: MCC, INC. PO Box 1137 Appleton, WI 54912-1137 Hot Mix Asphalt - 5,000 T. more or less - picked up Surface per ton $24.85t + 4.14tk=28. 99tk MICHELS CORPORATION 700 Tullar Road Neenah, WI 54956 Breaker Run 6" - 2,000 T. more or less: -- Delivered -- Alternate Breaker Run 3" - 2,000 T. more or less: -- Delivered - Alternate 1 1/2" base course - 3,000 T. more or less: - Delivered -- Alternate 3/4" base course -- 6,000 T. more or less: - Delivered -- Alternate 3/4" clear stone -- 2,000 T. more or less: - Delivered 1 1/2" clear stone - 2,000 T. more or less: - Delivered -- Alternate 3" clear stone - 1,000 T. more or less: - Delivered -- Alternate Sealcoat Chips -2,500 T. more or less: -- Picked up - Primary 7.35t 7.45t 7.45t 7.45t 8AOt 8AOt 9AOt $6.3Ot+3.24tk=9.54tk MARCH 8, 2005 -- Delivered - Alternate 05-58 8A5t RESOLUTION CONT'D Ready-mix concrete 1000 CY more/less: Slurry 1,000 T. more or less - Primary 9 bag HI early -- Primary Masonry Sand 50 yds -- Picked up - Alternate Delivered - Primary 40. Oat 75.00 cy 11 .60 yd 13.75yd NORTH EAST ASPHALT INC. W6380 Design Drive Greenville, WI 54942 Hot Mix Asphalt - Picked up - 5,OOOT. more/less: Binder per ton Alternate = $24.5Ot + 4.14tk = 28.64t Primary = $24.0Ot L + 4.14tk = 28.14tk Surface per ton Alternate = $26.0Ot L + 4.14tkt = 30.14tk VULCAN MATERIAL CO. 1301 Knapp Street Oshkosh, WI 54902 Breaker Run 6" - 2,000 T. more or less -- Delivered - Primary Breaker Run 3" - 2,000 T. more or less -- Delivered - Primary 1 1/2" base course - 3,000 T. more or less -- Delivered - Primary 3/4" base course - 6,000 T. more or less -- Delivered - Primary 1 1/2" clear stone - 2,000 T. more or less -- Picked up - Primary 3" clear stone - 1,000 T. more or less -- Delivered - Primary 7.0Ot 7.05t 7.05t 7.05t 8.35t 9.35t ZILLGES MATERIALS 1800 Fountain Ave. Oshkosh, WI 54904 Fill Sand - 200 T. - Picked up - Primary Delivered - Primary 3.0Ot 8.1Ot MARCH 8, 2005 05-58 RESOLUTION CONT'D CAREW CONCRETE 1811 W. Edgewood Dr. Appleton, WI 54913 Slurry - 1,000 T. more or less - Alternate 40. Oat 4X Concrete 2974 Green Hill Court Oshkosh, WI 54904 Class C 3/4" State Mix - Primary 4,000 PSI per C.Y. -Primary 5,000 PSI per C.Y. -Primary 7,000 PSI per C.Y. -Primary 61.00cy 59.00cy 63.00cy 71.00cy NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that said bids are hereby accepted and the proper City officials are hereby authorized and directed to enter into appropriate agreements for the purpose of same, all according to plans, specifications, and bids on file. Money for this purpose is hereby appropriated from: Acct. No.1 00-0430-6565-00000 - Street Department - Materials and supplies I-ton tk - Truckino Fee T p = primary vendor a = alternate vendor ) ROAD MATERIALS. 2005 BIDS OPENED. FEBRUARY 22,2005 MCC Inc Michels Corporation North East Asphalt Inc Vulcan Materials Co Zillges Materials Carew Concrete 4x Concrete DESCRIPTION PO Box 1137 700 Tullar Road W6380 Design Drive 1301 Knapp Street 1800 Fountain Ave 1811 W Edgewood Drive 2974 Green Hill Court Appleton, WI 54912-1137 Neenah, WI 54956 Greenville WI 54942 Oshkesh, WI 54902 Oshkosh WI 54904 Appleton WI 54913 Oshkosh Wi 54904 - BREAKER RUN 6" PICKED UP 5.20t + 3.24tk = 8.44t 5.05t + 3.24tk = 8.29tk 2.000 TONS MORE OR LESS DELIVERED 7.35t a 1/ 7.001 p ~. 8.75t 15t or more BREAKER RUN 3" PICKED UP 5.30t + 3.24tk = 8.54tk 5.10t + 3.24tk = 8.34e~ ¡ . 2,000 TONS MORE OR LESS DELIVERED 7.45t VA 7.05t p V 8.75t15tormore 1 1/2" BASE COURSE PICKED UP 5.30t + 3.24tk = 8.54tk 5.10t+3.24tk=8.34tk I 3,000 TONS MORE OR LESS DELIVERED 7.45t a J 7.05t p _../ 8.75t 15tor more 3/4" BASE COURSE PICKED UP 5.30t + 3.24tk = 8.54tk 5;10t + 3.24tk = 8.34tk . 6.000 TONS MORE OR LESS DELIVERED 7.45!J1..' Ý 7.05t p ./ 8.75t15tormore 3/4" CLEAR STONE PICKED UP 6.25t + 3.24tk = 9.49tk 6.25t + 3.24tk = 9.49tk 2,000 TONS MORE OR LESS DELIVERED 8.401 ../ 8.25t p 9.25t 15t or more 1 1/2" CLEAR STONE PICKED UP 6.25t + 3.24tk = 9.49tk 6.401 + 3.24tk = 9.54tk 2,000 TONS MORE OR LESS DELIVERED 8.40t A. If 8.35t p v' 9.25t 15t or more 3" CLEAR STONE PICKED UP 7.25t + 3.24tk = 10.49tk 7.40t + 3.24tk = 10.64tk 1,000 TONS MORE OR LESS DELIVERED 9.40t a V 9.35t p A/ 10.00t 15t or more SEALCOATCHIPS PICKED UP 6.301 + 3.24tk = 9.54tk P 2,500 TONS MORE OR LESS DELIVERED B.45t a / READY-MIX CONCRETE 1000 CY more/less CLASS C 3/4" STATE MIX 68.00cv 64.00cy 67.00cy 61.00cy P V 4.000 PSI PER C.Y. 54.00cv 60.00cy 63.00cy 59.00cyp ,/ 5,000 PSI PER C.Y 68.00cy 54.00cy 67.00cy 63.00C)i P ¡/ 7,000 PSI PER C.Y. 72.00cy 74.00cy 75.00cy 71.00cv 0 ./ Slurry 1,000 TNS MORE/LESS 48.00lon 40.00t p . .¡ 40.001 a ,/ 41.00t 9 BAG HI EARLY' 76.00 75.00cy p J 77.00cy 80.00cy Hot Water 3.00yd . Winter Service Heat Charge Nov 1 - Mar 31 .6.00yd 6.00yd MINIMUM DELIVERY CHARGE 70.00small 70.00 < 4vds 70.00 < 4 yds 6.00extra Sat HOT MIX ASPHALT PICKED UP 5,000 TONS MORE OR LESS 24.50t CS + 4.14tk = 28.64tk a" ' Binder Per ton 24.40t + 4.14tk = 28.54tk a 24-.00t L + 4;14tk - 2R14tk"0 -/ Surfacecer ton 24.85t + 4.14tk = 28.99tk p if 26.00tL+4.14tk=30.14tk bt- 26.50t CS + 4.14tk - 30.54tk -c- Portland Cement 100 BAGS 8.10ea 7.30ea 0 7.85ea a Masonry Sand 50 YDS PICKED UP 11.60yd a v J 27.001 39.001 < 10tons 13.00yd 12.00yd p DELIVERED 13.75vd 0 27.00t 39.00t < 101ons 16.00vd a Fill Sand 200 TONS PICKED UP R60t a 3.001 pr¡/, DELIVERED 10.75t a 8.101 0 "/ CS = coldspring L = Larsen