PURPOSE:
AWARD BID / ROAD MATERIALS /2005
INITIATED BY:
PURCHASING DIVISION
WHEREAS, the City of Oshkosh has heretofore advertised for bids for road
materials for 2005; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following
are the most advantageous bids:
MCC, INC.
PO Box 1137
Appleton, WI 54912-1137
Hot Mix Asphalt - 5,000 T. more or less - picked up
Surface per ton
$24.85t + 4.14tk=28. 99tk
MICHELS CORPORATION
700 Tullar Road
Neenah, WI 54956
Breaker Run 6" - 2,000 T. more or less:
-- Delivered -- Alternate
Breaker Run 3" - 2,000 T. more or less:
-- Delivered - Alternate
1 1/2" base course - 3,000 T. more or less:
- Delivered -- Alternate
3/4" base course -- 6,000 T. more or less:
- Delivered -- Alternate
3/4" clear stone -- 2,000 T. more or less:
- Delivered
1 1/2" clear stone - 2,000 T. more or less:
- Delivered -- Alternate
3" clear stone - 1,000 T. more or less:
- Delivered -- Alternate
Sealcoat Chips -2,500 T. more or less:
-- Picked up - Primary
7.35t
7.45t
7.45t
7.45t
8AOt
8AOt
9AOt
$6.3Ot+3.24tk=9.54tk
MARCH 8, 2005
-- Delivered - Alternate
05-58
8A5t
RESOLUTION
CONT'D
Ready-mix concrete 1000 CY more/less:
Slurry 1,000 T. more or less - Primary
9 bag HI early -- Primary
Masonry Sand 50 yds -- Picked up - Alternate
Delivered - Primary
40. Oat
75.00 cy
11 .60 yd
13.75yd
NORTH EAST ASPHALT INC.
W6380 Design Drive
Greenville, WI 54942
Hot Mix Asphalt - Picked up - 5,OOOT. more/less:
Binder per ton Alternate = $24.5Ot + 4.14tk = 28.64t
Primary = $24.0Ot L + 4.14tk = 28.14tk
Surface per ton Alternate = $26.0Ot L + 4.14tkt = 30.14tk
VULCAN MATERIAL CO.
1301 Knapp Street
Oshkosh, WI 54902
Breaker Run 6" - 2,000 T. more or less
-- Delivered - Primary
Breaker Run 3" - 2,000 T. more or less
-- Delivered - Primary
1 1/2" base course - 3,000 T. more or less
-- Delivered - Primary
3/4" base course - 6,000 T. more or less
-- Delivered - Primary
1 1/2" clear stone - 2,000 T. more or less
-- Picked up - Primary
3" clear stone - 1,000 T. more or less
-- Delivered - Primary
7.0Ot
7.05t
7.05t
7.05t
8.35t
9.35t
ZILLGES MATERIALS
1800 Fountain Ave.
Oshkosh, WI 54904
Fill Sand - 200 T. - Picked up - Primary
Delivered - Primary
3.0Ot
8.1Ot
MARCH 8, 2005
05-58
RESOLUTION
CONT'D
CAREW CONCRETE
1811 W. Edgewood Dr.
Appleton, WI 54913
Slurry - 1,000 T. more or less - Alternate
40. Oat
4X Concrete
2974 Green Hill Court
Oshkosh, WI 54904
Class C 3/4" State Mix - Primary
4,000 PSI per C.Y. -Primary
5,000 PSI per C.Y. -Primary
7,000 PSI per C.Y. -Primary
61.00cy
59.00cy
63.00cy
71.00cy
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that said bids are hereby accepted and the proper City officials are hereby
authorized and directed to enter into appropriate agreements for the purpose of same, all
according to plans, specifications, and bids on file. Money for this purpose is hereby
appropriated from:
Acct. No.1 00-0430-6565-00000 - Street Department - Materials and supplies
I-ton tk - Truckino Fee T
p = primary vendor a = alternate vendor )
ROAD MATERIALS. 2005
BIDS OPENED. FEBRUARY 22,2005
MCC Inc Michels Corporation North East Asphalt Inc Vulcan Materials Co Zillges Materials Carew Concrete 4x Concrete
DESCRIPTION PO Box 1137 700 Tullar Road W6380 Design Drive 1301 Knapp Street 1800 Fountain Ave 1811 W Edgewood Drive 2974 Green Hill Court
Appleton, WI 54912-1137 Neenah, WI 54956 Greenville WI 54942 Oshkesh, WI 54902 Oshkosh WI 54904 Appleton WI 54913 Oshkosh Wi 54904
-
BREAKER RUN 6" PICKED UP 5.20t + 3.24tk = 8.44t 5.05t + 3.24tk = 8.29tk
2.000 TONS MORE OR LESS DELIVERED 7.35t a 1/ 7.001 p ~. 8.75t 15t or more
BREAKER RUN 3" PICKED UP 5.30t + 3.24tk = 8.54tk 5.10t + 3.24tk = 8.34e~ ¡ .
2,000 TONS MORE OR LESS DELIVERED 7.45t VA 7.05t p V 8.75t15tormore
1 1/2" BASE COURSE PICKED UP 5.30t + 3.24tk = 8.54tk 5.10t+3.24tk=8.34tk I
3,000 TONS MORE OR LESS DELIVERED 7.45t a J 7.05t p _../ 8.75t 15tor more
3/4" BASE COURSE PICKED UP 5.30t + 3.24tk = 8.54tk 5;10t + 3.24tk = 8.34tk .
6.000 TONS MORE OR LESS DELIVERED 7.45!J1..' Ý 7.05t p ./ 8.75t15tormore
3/4" CLEAR STONE PICKED UP 6.25t + 3.24tk = 9.49tk 6.25t + 3.24tk = 9.49tk
2,000 TONS MORE OR LESS DELIVERED 8.401 ../ 8.25t p 9.25t 15t or more
1 1/2" CLEAR STONE PICKED UP 6.25t + 3.24tk = 9.49tk 6.401 + 3.24tk = 9.54tk
2,000 TONS MORE OR LESS DELIVERED 8.40t A. If 8.35t p v' 9.25t 15t or more
3" CLEAR STONE PICKED UP 7.25t + 3.24tk = 10.49tk 7.40t + 3.24tk = 10.64tk
1,000 TONS MORE OR LESS DELIVERED 9.40t a V 9.35t p A/ 10.00t 15t or more
SEALCOATCHIPS PICKED UP 6.301 + 3.24tk = 9.54tk P
2,500 TONS MORE OR LESS DELIVERED B.45t a /
READY-MIX CONCRETE 1000 CY more/less
CLASS C 3/4" STATE MIX 68.00cv 64.00cy 67.00cy 61.00cy P V
4.000 PSI PER C.Y. 54.00cv 60.00cy 63.00cy 59.00cyp ,/
5,000 PSI PER C.Y 68.00cy 54.00cy 67.00cy 63.00C)i P ¡/
7,000 PSI PER C.Y. 72.00cy 74.00cy 75.00cy 71.00cv 0 ./
Slurry 1,000 TNS MORE/LESS 48.00lon 40.00t p . .¡ 40.001 a ,/ 41.00t
9 BAG HI EARLY' 76.00 75.00cy p J 77.00cy 80.00cy
Hot Water 3.00yd .
Winter Service
Heat Charge Nov 1 - Mar 31 .6.00yd 6.00yd
MINIMUM DELIVERY CHARGE 70.00small 70.00 < 4vds 70.00 < 4 yds 6.00extra Sat
HOT MIX ASPHALT PICKED UP
5,000 TONS MORE OR LESS 24.50t CS + 4.14tk = 28.64tk a" '
Binder Per ton 24.40t + 4.14tk = 28.54tk a
24-.00t L + 4;14tk - 2R14tk"0 -/
Surfacecer ton 24.85t + 4.14tk = 28.99tk p if 26.00tL+4.14tk=30.14tk bt-
26.50t CS + 4.14tk - 30.54tk -c-
Portland Cement 100 BAGS 8.10ea 7.30ea 0 7.85ea a
Masonry Sand 50 YDS PICKED UP 11.60yd a v J 27.001 39.001 < 10tons 13.00yd 12.00yd p
DELIVERED 13.75vd 0 27.00t 39.00t < 101ons 16.00vd a
Fill Sand 200 TONS PICKED UP R60t a 3.001 pr¡/,
DELIVERED 10.75t a 8.101 0 "/
CS = coldspring
L = Larsen