HomeMy WebLinkAbout0112931-HVAC (furnace)
112931
CITY OF OSHKOSH
No
OSHKOSHHVAC PERMIT - APPLICATION AND RECORD
ON THE WATER
S T C MOKLER PROPERTIES LL
Job AddressOwner
645 FREDERICK ST
Create Date02/25/2005
ContractorMOKLER CONSTRUCTION LLCCategory500 - Residential-Heating & VentilatingPlan
OilElectric
üü GasSolarSolid
Fuel
New üü ReplaceOther
System
üü Forced AirRadiantSteamA/CVent
ElectricHot WaterSuppl.Con. Burner
Chimney TypeChimney AChimney BDirect VentNot Applicable
Heat LossAs ApprovedExistingNot ApplicableValue0
As Per PlanVariableOther
BTU RateValue80000
Use/Nature
SFR/ Replace furnace, No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE
of Work
- No chimney liner being installed -Where an appliance is permanently disconnected from an existing chimney or vent (C/V), the C/V shall be
resized as necessary to control flue gas condensation in the interior of the C/V and to provide the appliance or appliances served with the req. draf
Plan Approval$0.00
Fees: Valuation$1,289.90Permit Fee Paid$24.50
Issued By:Date03/07/2005
Permit Voided
Parcel Id #0704260000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
Address1117 W NEW YORK AVEOSHKOSHTelephone Number920-235-6470
WI54901-0
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.