HomeMy WebLinkAbout0112929-HVAC (furnace)
112929
CITY OF OSHKOSH
No
OSHKOSHHVAC PERMIT - APPLICATION AND RECORD
ON THE WATER
CHARLES A BONGERT
Job AddressOwner
11 W 12TH AVE
Create Date03/07/2005
ContractorG L R COMPANYCategory500 - Residential-Heating & VentilatingPlan
OilElectric
üü GasSolarSolid
Fuel
New üü ReplaceOther
System
üü Forced AirRadiantSteamA/CVent
ElectricHot WaterSuppl.Con. Burner
Chimney TypeChimney AChimney BDirect VentNot Applicable
Heat LossAs ApprovedExistingNot ApplicableValue0
As Per PlanVariableOther
BTU RateValue
Use/Nature
SFR/ Replace furnace - No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE
of Work
No Chimney Liner being installedWhere an appliance is permanently disconnected from an existing chimney or vent (C/V), the C/V shall be
resized as necessary to control flue gas condensation in the interior of the C/V and to provide the appliance or appliances served with the req.
draft.
Plan Approval$0.00
Fees: Valuation$2,100.00Permit Fee Paid$36.50
Issued By:Date03/07/2005
Permit Voided
Parcel Id #0303600000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
Address4860 COUNTY ROAD KOSHKOSHTelephone Number(920) 233-0784
WI54904-0
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.