HomeMy WebLinkAbout0112941-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 1230 MONROE ST
CITY OF OSHKOSH
No
112941
BUILDING PERMIT - APPLICATION AND RECORD
Owner
LONNIE SCHAAL/JODI BAUR
Create Date
03/07/2005
Designer
Contractor
WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling
Plan
Type
I. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
0 Sq.Ft.
~ Sq. Ft.
U Projection 1
Finished/Living
Canopies
0
Garage
~ Sq. Ft.
Signs
0
Foundation . Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
SFR/ Installation of 11 replacement windows in existing openings - NO STRUCTURAL WORK!
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,615.00
Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 03/07/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1508300000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
7933 N 73RD ST
Agent/Owner
MILWAUKEE
WI 53222 - 0000 Telephone Number
920-921-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.