HomeMy WebLinkAbout0112937 B
e
OSHKOSH
ON THE WATER
Job Address 2041-2155 S KOELLER ST
CITY OF OSHKOSH
No
112937
BUILDING PERMIT - APPLICATION AND RECORD
Owner
USPG PORTFOLIO TWO LLC
Create Date
03/07/2005
Designer
Contractor
DOTS CONST INC
Category
232 - Alteration Stores & Customer Service
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation 8 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
COMM / (2057 - Rogans) Reconfigure office partition walls as per sketch. ALL ACCESSIBILITY REQUIREMENTS TO BE MET - This permit
does not include any electrical work!
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,500.00
Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 03/07/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1323100400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
430 DOTY ST
Agent/Owner
FOND DU LAC
WI 54935 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
e
OSHKOSH
ON THE WATER
Job Address 2041-2155 S KOELLER ST
CITY OF OSHKOSH
No
112937
BUILDING PERMIT - APPLICATION AND RECORD
Owner
USPG PORTFOLIO TWO LLC
Create Date
03/07/2005
Designer
Contractor
DOTS CONST INC
Category
232 - Alteration Stores & Customer Service
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation 8 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
COMM / Reconfigure office partition walls as per sketch. ALL ACCESSIBILITY REQUIREMENTS TO BE MET - This permit does not include
any electrical work!
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,500.00
Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 03/07/2005
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1323100400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
430 DOTY ST
Agent/Owner
FOND DU LAC
WI 54935 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.