Loading...
HomeMy WebLinkAbout0112920-Building (foundation) /� CITY OF OSHKOSH No 112920 !�� �GpNN.� �O OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD APR 5� ON THE WATER � Job Address 54 GIBSON CT Owner ELIZABETH A LAHM Create 03/02/2005 Designer Contractor J&D CONSTRUCTION Category 112-Foundation Permit Single Family Plan G1-002-0305 Type � Building 0 Sign 0 Canopy � Fence � Raze j Zoning Class of Const: VB Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection I Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood ---- Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature INSFR/Early Start Permit- Foundation Only! of Work �I � � � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valua ion $10,000.00 Plan Approval $0.00 Permit Fee Paid $149.00 Park Dedication $0.00 Issued By: �� Date 03/04/2005 Final/O.P. 00/00/0000 � Permit Voided', Parcel Id# 1413344500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit app� ation within an eas ment he City strongly urges the permit applicant to contact the easement holder(s)and to secure , y ece approv be r st i h activity. Si nature f �l� Date — y'-4 9 AgenUOwner Address 2948 FOND DU LAC RD Oshkosh WI 54902 - 0000 Telephone Number 920-410-4106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.