HomeMy WebLinkAbout0112756-Building (landing & stairs)
~o
OSHKOSH
ON THE WATER
Job Address 621 WAUGOO AVE
CITY OF OSHKOSH
No
I
112756
BUILDING PERMIT. APPLICATION AND RECORD
Owner MICHAEL R DORSEY
Create Date
02/23/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
a Sign
a Canopy
a Fence
a Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms Height
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths
0 Ft.
0 Projection I
Canopies' 0
--,--
Signs
0
--,--
Foundation
. Poured Concrete a Fioating Slab
a Concrete Biock a Post
a Pier
a Treated Wood
a Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units --2
# Structures
--2
Park Dedication
Use/Nature ~FRI Replacing the stairs at all 3 exits from the house, replacing the front landing and all hand and guardrails for ail exits. Instaii column
of Work posts for roof support on the side porch.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$1,995.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
CVf
Date 02/23/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0202000000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit applic' ~h' easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure y c approv s before starting such activity. / /
Signature ;¿ Date X .2-/)-"3/ ð)'
, I
Agent/Owner
Address 1621 JACKSON ST
~ 54901 - 2943 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.