Loading...
HomeMy WebLinkAbout0112756-Building (landing & stairs) ~o OSHKOSH ON THE WATER Job Address 621 WAUGOO AVE CITY OF OSHKOSH No I 112756 BUILDING PERMIT. APPLICATION AND RECORD Owner MICHAEL R DORSEY Create Date 02/23/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building a Sign a Canopy a Fence a Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms Height Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 Ft. 0 Projection I Canopies' 0 --,-- Signs 0 --,-- Foundation . Poured Concrete a Fioating Slab a Concrete Biock a Post a Pier a Treated Wood a Other Occupancy Permit Flood Plain Height Permit # Dwelling Units --2 # Structures --2 Park Dedication Use/Nature ~FRI Replacing the stairs at all 3 exits from the house, replacing the front landing and all hand and guardrails for ail exits. Instaii column of Work posts for roof support on the side porch. HVAC Contractor Plumbing Contractor Electric Contractor $1,995.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: CVf Date 02/23/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0202000000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit applic' ~h' easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y c approv s before starting such activity. / / Signature ;¿ Date X .2-/)-"3/ ð)' , I Agent/Owner Address 1621 JACKSON ST ~ 54901 - 2943 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.