HomeMy WebLinkAbout0112701-HVAC (relocate units)
~
OSHKOSH
ON THE WATER
Job Address 3565 N MAIN ST
CITY OF OSHKOSH
HVAC PERMIT - APPLICATION AND RECORD
No
112701
Owner
OSHCON CORP
Create Date 02115/2005
Contractor AUGUST WINTER & SONS INC
Fuel 1'-'1 Gas 1 I Oil
System n New 1
~ Forced Air ~ Radiant
1 I Electric I 1 Hot Water
Chimney Type U Chimney A . Chimney B
Heat Loss K ) As Approved . Existing
BTU Rate K) As Per Plan . Variable
Category 510 - indo & Comm-Heating & Ventilating
Plan
1 1 Electric
0 Replace
U Steam
1 1 Suppl.
1 1 Solar
1 I Solid
11'1 Other
() Direct Vent
U AlC I
1 1 Con. Burner I
e) Not Applicabie
U Vent
( ) Not Applicable
e) Other
Value
Value
Use/Nature INO/ Relocate existing cooling unit, make-up air unit, infrared unit, reconnect ductwork, gas pipe, and controls - Equipment is being
of Work elocated in the same area, to serve the same area, only being done to provide additional clearance.
Fees: Valuation
$19,604.00
Plan Approval
$0.00
Permit Fee Paid
$252.00
Date 02/16/2005
Issued By:
D Permit Voided I
Parcelld # 1519605200
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Si9nature
Date
Agent/Owner
Address
PO BOX 1896
APPLETON
WI 54912 -1898 Telephone Number
920-739-8881
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.