HomeMy WebLinkAbout0112699-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1020 BONG CT
CITY OF OSHKOSH
No
112699
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DANE Q PECORE
Create Date 02/16/2005
Contractor ATOMIC PLUMBING
Category 410- Residential-Interior
Plan
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 Local Waste 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0
Toilet ---2 Lndry Stndp 0 Clothes Wshr ---2 Ice Chest ---2 Flr/Wst Sink ---2 Int Grease Trap 0
Res, Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap ---2
Bar Sink 0 Dishwasher 0 BeerTap 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Water Heater 1 Sump Pump 0 Denl. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature FRI Replace electric water heater with new direct vent gas water heater.
of Work
Size
Material
Conn. Type
Type
#
0
0
0
0
0
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1109380000
Valuation
$1,600,0 ~ Plan Approval
$0,00
Permit Fees
$20.00 0 Permit Voided i
Issued By
Date 02/16/2005
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit ap lication within an easement, the City strongly urges the permit applicant to contact the
easement ho er( nd t ure any necessary approvals before starting such activity.
Date Þ)b-OS
AgenUOwner
RIPON
WI 54971 - 0000
Telephone Number
748-5359
Signature
Address PO BOX 388
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.