HomeMy WebLinkAbout2005-Plumbing (toilet)
~
OSHKOSH
ON THE WATER
Job Address 1002 PIERCE AVE
CITY OF OSHKOSH
No
112544
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SAMMONS PLUMBING
Category 410 - Residential-Interior
Create Date 02/03/2005
Plan
Owner SHELDON CHAPIN
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain ~ Water Softner 0 Drink Ftn 0 Serv Sink ~ Soda Disp 0
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 1 Lndry Stndp ~ Clothes Wshr ~ Ice Chest ~ FlrlWst Sink ~ Int Grease Trap 0
Res. Sink 0 Disposal ~ Bidet 0 Exam Sink 0 Catch Basin ~ Ext Grease Trap 0
Bar Sink 0 Dishwasher ~ Beer Tap 0 Sculry Sink ~ Wash Ftn ~ RPZValve 0
Water Heater 0 Sump Pump ~ Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
'_ore .
of Work
INSTALL TOILET
Type
#
0
0
0
0
0
Size
Material
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1606700000
Valuation
$250.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date 02/03/2005
In the performance of this work. I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. If you perfonm the work
described in this penmlt application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522 W. MURDOCK AVE
AgenUOwner
OSHKOSH
WI 54901 - 2298
Telephone Number
231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.