HomeMy WebLinkAbout0112721-Plumbing (laterals)
e CITY OF OSHKOSH No 112721
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 355 CEAPE AVE Owner CITY OF OSHKOSH Create Date 02/17/2005
Contractor LEE PLUMBING INC Category 430 - Industrial-Exterior (laterals) Plan
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
- - - - - -
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
- - - - - -
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
-
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
- - - - - -
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
- -
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
- - - - -
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
- - - - -
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature INSTALL SEWER AND WATER LATERALS FOR NEW PARK SHELTER
of Work
Sanitary Sewer
Size
4"
Material
Plastic
Storm Sewer
Water Service
2"
Copper
Type # Conn. Type
Lateral 1 New
0
0
0
0
0
0
0
0
0
Lateral 1 New
0
0
0 Parcelld #
0
$0.00 U Permit Voided I
Date 02/21/2005
Valuation
$1,500.00
$0.00
Permit Fees
Plan Approval
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
Agent/Owner
APPLETON
920-213-3867
WI 54912 - 0000
POBOX 7292
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.