Loading...
HomeMy WebLinkAbout0112712-Building e OSHKOSH ON THE WATER Job Address 1036 MACARTHUR RD CITY OF OSHKOSH No 112712 BUILDING PERMIT - APPLICATION AND RECORD Owner SUE A HOWELL Create Date 02/18/2005 Designer Contractor JACOBSON EXCAVATING Category 161 - Wrecking Residential Dwellings Plan Type 10 Building 0 Sign 0 Canopy 0 Fence . Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Razing the existing dwelling, the garage will remain with the new home. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 02/18/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1519629600 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1036 MACARTHUR RD Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 414-235-7603 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.