Loading...
HomeMy WebLinkAbout0112736-Building (sign) e OSHKOSH ON THE WATER Job Address 640 N MAIN ST CITY OF OSHKOSH No 112736 BUILDING PERMIT - APPLICATION AND RECORD Owner 640 N MAIN LLC Create Date 02/21/2005 Designer Contractor OWNER Category 254 - Signs Plan Type 10 Building . Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Auto repair/ 5x12 painted wall sign on south wall, 12x15 painted sign on north wall, 12" plastic letter signs over service bay doors, 14" plastic letter sign (Expert Automotive Center) on south wall of showroom. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 02/21/2005 Final/O.P. 00/00/0000 U Permit Voided I Parcelld # 0402210000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 915 S MAIN ST Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. r:- <t-