Loading...
HomeMy WebLinkAbout0112707-Building e OSHKOSH ON THE WATER Job Address 547 W 8TH AVE CITY OF OSHKOSH No 112707 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID J TRUTTMANN Create Date 02/18/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 SFR/ Gutting the entire house, installing new insulation, drywall, kitchen and bathroom cabinets. Installing new vinyl siding and re-roofing the house (complete tear off). Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $28,000.00 Plan Approval $0.00 Permit Fee Paid $148.00 Park Dedication $0.00 Issued By: Date 02/18/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0600910000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 807 MEETING HALL DR Agent/Owner MORRISVILLE NC 27560 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.