Loading...
HomeMy WebLinkAbout0112734-Building (south central area) e OSHKOSH ON THE WATER Job Address 246 CITY CENTER CITY OF OSHKOSH No 112734 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY CENTER ASSOCIATES LLC Create Date 02/21/2005 Designer Contractor OWNER Category 223 - Alteration Offices, Banks, Professional Plan Type I. Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Office Mall/ Demo several spaces in south central area of building, including management office, in preparation for remodel to combine these spaces into one tenant suite. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $86,250.00 Plan Approval $0.00 Permit Fee Paid $325.00 Park Dedication $0.00 Issued By: Date 02/21/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 0100600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 246 CITY CENTER Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 233-5056 Common F To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.