Loading...
HomeMy WebLinkAbout0099530-Electric (service change)OSHKOSH ON THE WATER Job Address 115 W SOUTH PARK AVE Contractor J.A.W.S. ELECTRIC Service ~) New O Change Volts 120 / 240 CITY OF OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD Amps 100 Owner Category Circuits Switches (~) Temp CALEB J/SUSAN M NICHOLS 634 - Residential-Service Change Type ~_ Overhead 0 0 No 99530 Create Date 01/21/2003 Plan (~ Underground Fixtures Receptacles Appliances Use/Nature of SFR/100 amp overhead service upgrade Work Fees: Valuation Issued By: / $750.00 Plan Approval $0.00 Permit Fee Paid $35.00 [] Permit Voided Date 01/21/2003 In the performance pf this Address P~X 22 all work pursuant to rules governing the described construction. Date Agent/Owner VAN DYNE WI 54979 - 22 Telephone Number (920) 688-2477 City of Oshkosh Division of Inspection Services P.O. Box 1130 Oshkosh, WI 54903-1130 Phone (920) 236-5050 Fax (920) 236-5084 O/HKO/H ON THF \,VATER ELECTRICAL PERMIT APPLICATION All information after bold categories must be provided. Incomplete applications will not be processed. · Application(s) and fee(s) can be brought to City Hall, Room 205 or mailed to Inspection Services, PO Box 1128, Oshkosh WI 54903-1128. Commencing work without permit(s) will result .in fees being doubled or $100.00 plus the normal permit fee, which ever is greater. OR If you are a contractor participating in the Permit Fee Account SFstem and have adequate funds, check here if you want this processed through your account [] DATE ) I CHECK [] ALL APPLICABLE USE CATEGORY ~[Single Family [2Duplex [2Multi-Family SERVICE l-lNew F1Temporary ~Change F1Not Applicable [2Rental [2Commercial [2Industrial TYPE ~)verhead FINot Applicable ElUnderground FILL IN THE APPROPRIATE BLANK WITH TIlE NUMBER Volts ) ~O / ~ID Receptacles # Phase ! ~Z5 Amps / 0 C;> Switches # Circuits # Fixtures # CHECK [] ALL APPLICABLE F1Range F1Dishwasher F1Garbage Disposal F1Fan OR Blower F1Fumace [3A/C VIMotors VIGas Pumps FlOther F1Dryer ElElectric Sign [3Water Heater DESCRIPTION OF ALL WORK BEING DONE 3/02