HomeMy WebLinkAbout0098717 HOSHKOSH
ON THE WATER
Job Address
Contractor
Fuel
System
Chimney Type
Heat Loss
BTU Rate
CITY OF OSHKOSH
HVAC PERMIT -APPLICATION AND RECORD
522 530 N MAIN ST
MARX MECHANICAL LLC
II Gas I ~1 Oil
[] New I
~J Forced Air j L-J Radiant
Electric t ~ Hot Water
ChimneyA ~ Chimney B
As Approved ~_.~ Existing
~ As Per Plan (.~ Vadable
Owner AUTHORITY OSHKOSH HOUSING
Category 501 - Residential-Air Conditioning
~-~lectric 1 ~'Solar
[] Replace
I-J Steam I ~j NC
LJ Suppl. I L~ Con. Burner
~ Direct Vent ~I Not Applicable
~ Not Applicable J
~11 Other
Value
Value
No 98717
Create Date 11/19/2002
Plan
1 ~ Solid
[] Other
Vent
Use/Nature
of Work
r~partments/Install a
new Air handling unit and 15T condensor to existing system. See letter from architect.
Fees: Valuation ~ ~2.00 Plan Approval $0.00 Permit Fee Paid
Issued By:
[] Permit VoidedI
$0.00
Date 11/19/2002
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
Signature Date
Agent/Owner
Address 4535 STATE ROAD 91 OSHKOSH WI 54904 - 6304 Telephone Number
(920)235-6510
HGM
A R C H I T E C T U R E
Ronald D. Hansche A/A
James J. Groff A/A
City of Oshkosh
Chief Building Inspector
215 Church Ave.
Oshkosh, WI 54901
November 15, 2002
Att: AllYn Danhoff
RE: Mainview Apartments
HGM Architecture, Inc. Project No. 3100.1
Dear Allyn:
As a follow up to our recent telephone conversation, following is an explanation of the changing
of the make up air handling unit that serves the Tower section floors 3 through 10 at Mainview.
This air handling Unit is being replaced in order t° install a cooling coil for air conditioning.
This unit presently only provides air to make up air lost by use of the toilet room exhausts. This
make up air will now be heated when the t~inperature is below a set point and cooled when
temperature is ab°ve a set point. Between these points unconditioned air is used to provide make
up.
The theory behind this air handler is to pressurize the corridors and force air into the apartments
for use by the toilet exhaust and minimize i~!tratiog. The goal is to provide a slight positive
pressure through out.
The corridors do not depend on this make up air unit for heat, Each floor..~ho~jts own hydronic
radiation.
From our discussions this explanation should meet with your approval to issue the permit for
replacement.
If there are additional questions, please call.
Ronald D. Hansche
HGM Architecture, Inc.
Cc Marx Mechanical ..............
Brad Masterson
805 North Main Street * P. O. Box 0976 .* Oshkosh, WI 54903-0976 * Phone (920) 231-6950 * FAX (920) 231-4518
City'of Oshkosh
Division of Inspection Services
P.O. Box 1130
Oshkosh, WI 54903-1130
Phone (920) 236-5050
Fax (920) 236-5084
HVAC PERMIT APPLICATION
All information after bold categories must be provided.
Incomplete applications will not be processed.
O/HKO/H
O~ THE WATER
· Application(s) and fee(s) can bd brought to City Hall, Room 205 or mailed to Inspection Services, PO Box 1128,
Oshkosh WI 5490%1128. Commencing work without permit(s) will result in fees being doubled or $100.00 plus the
normal permit fee, which ever is greater.
OR
If you are a contractor participatin~ in the Permit fee Account System and have adequate funds, check here
if you want this processed through your account ~-]
DATE 10 -~} ~O~, '
JOB ADDRESS
CO T CTOR
CltECK [] ALL APPLICABLE
USE CATEGORY
ID Single Family F-tDUpiex · i-1Multi_FamilY:' : l--iRental
~ommercial
rqlndustrial
FUEL J~[Das F1Electric mSolid SYSTEM ~lNew IDReplace
E]Oil F1Solar DOther
TYPE
JZlForced Air l-lRadiant I-1Steam I~[A/C F1Vent []Electric F-lHot Water IISuppl. ECon. Burner
IS CHIMNEY BEING LINED [~No [3Yes - LINER SIZE
Note: All chimneys shall be sized per the BTU's being vented.
& MANUFACTURER
CHIMNEY TYPE
HEAT LOSS
BT~. ~. RATE
L] Chirrmcy A
mAs Approved
l-lAs Per Plan
IDChimney B
[3Existing
[3Variable
12]DirectVent
[3NotApplicable
[]Other Value
[3Other
DESCRIPTION OF ALL WORK BEING DONE
V~UE~(ih'audlng labor h~d aii~'mateHai~ihdhai"glight fiXt%~S} $ ~q, 0 J&: ~%
ELECTmC~ CONT~CTOR ~% ~~[ 0
D For applicable projects, an ~lec~c ~stallatio~ Ve6fication fo~, si~ed by the ~lec~cal Cos~actoL mast be
a~ached. If not a~ached or not applicable, a sep~ate ~lec~ca] Pe~t is requ~ed.
9/o2