Loading...
HomeMy WebLinkAbout0098717 HOSHKOSH ON THE WATER Job Address Contractor Fuel System Chimney Type Heat Loss BTU Rate CITY OF OSHKOSH HVAC PERMIT -APPLICATION AND RECORD 522 530 N MAIN ST MARX MECHANICAL LLC II Gas I ~1 Oil [] New I ~J Forced Air j L-J Radiant Electric t ~ Hot Water ChimneyA ~ Chimney B As Approved ~_.~ Existing ~ As Per Plan (.~ Vadable Owner AUTHORITY OSHKOSH HOUSING Category 501 - Residential-Air Conditioning ~-~lectric 1 ~'Solar [] Replace I-J Steam I ~j NC LJ Suppl. I L~ Con. Burner ~ Direct Vent ~I Not Applicable ~ Not Applicable J ~11 Other Value Value No 98717 Create Date 11/19/2002 Plan 1 ~ Solid [] Other Vent Use/Nature of Work r~partments/Install a new Air handling unit and 15T condensor to existing system. See letter from architect. Fees: Valuation ~ ~2.00 Plan Approval $0.00 Permit Fee Paid Issued By: [] Permit VoidedI $0.00 Date 11/19/2002 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Signature Date Agent/Owner Address 4535 STATE ROAD 91 OSHKOSH WI 54904 - 6304 Telephone Number (920)235-6510 HGM A R C H I T E C T U R E Ronald D. Hansche A/A James J. Groff A/A City of Oshkosh Chief Building Inspector 215 Church Ave. Oshkosh, WI 54901 November 15, 2002 Att: AllYn Danhoff RE: Mainview Apartments HGM Architecture, Inc. Project No. 3100.1 Dear Allyn: As a follow up to our recent telephone conversation, following is an explanation of the changing of the make up air handling unit that serves the Tower section floors 3 through 10 at Mainview. This air handling Unit is being replaced in order t° install a cooling coil for air conditioning. This unit presently only provides air to make up air lost by use of the toilet room exhausts. This make up air will now be heated when the t~inperature is below a set point and cooled when temperature is ab°ve a set point. Between these points unconditioned air is used to provide make up. The theory behind this air handler is to pressurize the corridors and force air into the apartments for use by the toilet exhaust and minimize i~!tratiog. The goal is to provide a slight positive pressure through out. The corridors do not depend on this make up air unit for heat, Each floor..~ho~jts own hydronic radiation. From our discussions this explanation should meet with your approval to issue the permit for replacement. If there are additional questions, please call. Ronald D. Hansche HGM Architecture, Inc. Cc Marx Mechanical .............. Brad Masterson 805 North Main Street * P. O. Box 0976 .* Oshkosh, WI 54903-0976 * Phone (920) 231-6950 * FAX (920) 231-4518 City'of Oshkosh Division of Inspection Services P.O. Box 1130 Oshkosh, WI 54903-1130 Phone (920) 236-5050 Fax (920) 236-5084 HVAC PERMIT APPLICATION All information after bold categories must be provided. Incomplete applications will not be processed. O/HKO/H O~ THE WATER · Application(s) and fee(s) can bd brought to City Hall, Room 205 or mailed to Inspection Services, PO Box 1128, Oshkosh WI 5490%1128. Commencing work without permit(s) will result in fees being doubled or $100.00 plus the normal permit fee, which ever is greater. OR If you are a contractor participatin~ in the Permit fee Account System and have adequate funds, check here if you want this processed through your account ~-] DATE 10 -~} ~O~, ' JOB ADDRESS CO T CTOR CltECK [] ALL APPLICABLE USE CATEGORY ID Single Family F-tDUpiex · i-1Multi_FamilY:' : l--iRental ~ommercial rqlndustrial FUEL J~[Das F1Electric mSolid SYSTEM ~lNew IDReplace E]Oil F1Solar DOther TYPE JZlForced Air l-lRadiant I-1Steam I~[A/C F1Vent []Electric F-lHot Water IISuppl. ECon. Burner IS CHIMNEY BEING LINED [~No [3Yes - LINER SIZE Note: All chimneys shall be sized per the BTU's being vented. & MANUFACTURER CHIMNEY TYPE HEAT LOSS BT~. ~. RATE L] Chirrmcy A mAs Approved l-lAs Per Plan IDChimney B [3Existing [3Variable 12]DirectVent [3NotApplicable []Other Value [3Other DESCRIPTION OF ALL WORK BEING DONE V~UE~(ih'audlng labor h~d aii~'mateHai~ihdhai"glight fiXt%~S} $ ~q, 0 J&: ~% ELECTmC~ CONT~CTOR ~% ~~[ 0 D For applicable projects, an ~lec~c ~stallatio~ Ve6fication fo~, si~ed by the ~lec~cal Cos~actoL mast be a~ached. If not a~ached or not applicable, a sep~ate ~lec~ca] Pe~t is requ~ed. 9/o2