HomeMy WebLinkAbout0103907-Building (deck) ' ' (~ CITY OF OSHKOSH No 103907
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
JobAddress 1369 RAHRAVE Owner STEPHEN M BULLARD/KGREMMINGER Create Date 09/04/2003
Designer Contractor SORENSON BUILDERS
Category 142 - Decks, Patios, Ramps Plan
Foundation
Occupancy Permit
Park Dedication
Type · Building (~ Sign C) canopy C) Fence {~ Raze
Zoning Class of Const:
Unfinished/Basement 0 Sq, Ft. Rooms 0 Height 0 Ft.
Finished/Living 0 Sq~ Ft. Bedrooms 0 Stories
Garage 0 Sq, Ft. Baths 0
· Poured Concrete (~ Floating Slab (~ Pier O Other
C) concrete Block (~ Post (~ Treated Wood
Flood Plain
# Dwelling Units 0
Size
[] Projection J
Canopies
Signs
Height Permit
# Structures 0
Use/Nature ~FPJ Constructa 13' x10' deck at grade level with a 7' x S' porch above it.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: (~
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
Plumbing Contractor
$45.00 Park Dedication $0.00
Date 09/04/2003 Final/O.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ap. DJ~op.~in an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur~J~/h.,~sary approvals before starting such activity.
Signature '~~gentJOwner Date -~'-~ ~_/~ ~- ~/, / -~z~'i
Address W10618 CEDAR RD LARSEN WI 54947 - 0000 Telephone Number 836-2889
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.