Loading...
HomeMy WebLinkAbout0103915 BOSHKOSH ON THE WATER .lob .Address 115 W MELVIN AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY/JO ANN DREXLER Contractor OWNER Category 140 - Interior Remodeling No 103915 Create Date 08/26/2003 Plan Type [(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling the attic opening up 2 rooms to make 1, convert master bedroom into 2 rooms by adding a door in living room and a wall in of Work lhe existing master bedroom. HVAC Contractor Electric Contractor Fees: Valuation Issued By: HOMEOWNER Plumbing Contractor $10,000.00 Plan Approval $0.00 Permit Fee Paid $65.00 Park Dedication $0.00 Date 09/04/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 115 W MELVIN AVE OSHKOSH WI 54901 - 3716 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER ,Job Address 115 W MELVIN AVE Designer Category Type Zoning 140 - interior Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY/JOANN DREXLER Create Date Contractor OWNER · Building (~ Sign O Canopy (~ Fence C) Raze Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab C) concmte Block (~) Post Occupancy Permit Park Dedication No 103915 08/26/2003 Class of Const: Rooms 0 Bedrooms 0 Baths 0 (~ Pier O Treated Wood Flood Plain # Dwelling Units Height 0 Ft. Stories Other Plan Size [] Projection Canopies 0 Signs 0 Height Permit 0 # Structures 0 Use/Nature of Work SFPJ Remodeling the attic opening up 2 rooms to make 1, convert master bedroom into 2 rooms by adding a door in living room and a ¢¢all in the existing master bedroom. HVAC Contractor Electric Contractor Fees: Valuation Issued By: J~. HOMEOWNER $10,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $65.00 Park Dedication $0.00 Date 09/04/2003 Final/O.P. 00/00/0000 [] Permit VoidedI In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary_~pprovals before starting such activity. Signature '~ (~, O ,J/~f'~ ~N,.q~jL~f~ Date q-- /~/--~j~ I ~.. Agent/Owner Address 115 W MELVIN AVE OSHKOSH WI 54901 - 3716 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.