HomeMy WebLinkAbout0103985-Building (remodel)OSHKOSH
ON THE WATER
Job Address 2620 TEMPLETON PL
Designer
Category
Type
Zoning
141 - Extedor Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner LEE A SOSNOSKI
Contractor OWNER
No 103985
Create Date 09/05/2003
Plan
· Building (~ Sign C~) Canopy C) Fence O Raze
Class of Const: Size
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation (~) Poured Concrete ~) Floating Slab
O Concrete Block ~ Post
Occupancy Permit Not Required
Park Dedication
Rooms 0 Height 0 Ft. [] Projection
Bedrooms 0 Stories Canopies
Baths 0 Signs
O Pier · Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Use/Nature
of Work
SFR/Install new patio door in master bedroom to provide access to deck (this is a new wall opening.) Remove wall between MB and rear
3edroom to create larger MB suite. Install a bay window to replace two windows in the MB suite. (based on owner's des cdption this will
'equim a new header as existing windows are not adjacent to each other.)
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: __
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided
P[umbing Contractor
$40.00 Park Dedication $0.00
Date 09/05/2003 Final/O.P. 00/00/0000
in the performance of this work I agree to perform all work pursuant to rules governing the described constmc[ion.
While the City of Oshkosh has no authority to enforce easement restdc'[ions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starling such activity.
Signature %~.~._~;.,.~ ~..~t~_~ ,~ Date
Agent/Owner
Address 2620TEMPLETON PL OSHKOSH WI 54904 - 8314 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.