Loading...
HomeMy WebLinkAbout0103985-Building (remodel)OSHKOSH ON THE WATER Job Address 2620 TEMPLETON PL Designer Category Type Zoning 141 - Extedor Remodeling CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner LEE A SOSNOSKI Contractor OWNER No 103985 Create Date 09/05/2003 Plan · Building (~ Sign C~) Canopy C) Fence O Raze Class of Const: Size Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation (~) Poured Concrete ~) Floating Slab O Concrete Block ~ Post Occupancy Permit Not Required Park Dedication Rooms 0 Height 0 Ft. [] Projection Bedrooms 0 Stories Canopies Baths 0 Signs O Pier · Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature of Work SFR/Install new patio door in master bedroom to provide access to deck (this is a new wall opening.) Remove wall between MB and rear 3edroom to create larger MB suite. Install a bay window to replace two windows in the MB suite. (based on owner's des cdption this will 'equim a new header as existing windows are not adjacent to each other.) HVAC Contractor Electric Contractor Fees: Valuation Issued By: __ Plan Approval $0.00 Permit Fee Paid [] Permit Voided P[umbing Contractor $40.00 Park Dedication $0.00 Date 09/05/2003 Final/O.P. 00/00/0000 in the performance of this work I agree to perform all work pursuant to rules governing the described constmc[ion. While the City of Oshkosh has no authority to enforce easement restdc'[ions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature %~.~._~;.,.~ ~..~t~_~ ,~ Date Agent/Owner Address 2620TEMPLETON PL OSHKOSH WI 54904 - 8314 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.