Loading...
HomeMy WebLinkAbout0103916 EOSHKOSH ON THE WATER Job Address Contractor Service Volts Amps 115W MELVIN AVE HOMEOWNER [~ New (~ Change (~ Tamp CITY OF OSHKOSH ELECTRIC PERMIT - APPLICATION AND RECORD Owner Category No 103916 TIMOTHY/JO ANN DREXLER Create Date 09/04/2003 612 - Residential-Single Family Addition/Ret Plan Type I© Overhead (~ Underground I Circuits 0 Fixtures 0 Switches 0 Receptacles 0 Appliances Use/Nature of 3FR/ Remodeling the attic opening up 2 rooms to make 1, convert master bedroom into 2 rooms by adding a door in living room and a wall in Work :he existing master bedroom. Fees: Valuation Issued By: $1,100.00 Plan Approval $0.00 Permit Fee Paid $60.00 Date 9/4/03 Permit Voided The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address OSHKOSH WI 5490 - 3716 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Job Address 115 W MELVIN AVE CITY OF OSHKOSH ELECTRIC PERMIT- APPLICATION AND RECORD Owner TIMOTHY/JO ANN DREXLER Create Date 09/04/2003 Contractor HOMEOWNER Category 612- Residential-Single FamilyAddition/R Plan Service ~ New (~ Change (~ Tamp Type O Overhead (~ Underground Volts Circuits 0 Fixtures 0 Amps 0 Switches 0 Receptacles 0 No103916 Appliances Use/Nature of SFR/ Remodeling the attic opening up 2 rooms to make 1, convert master bedroom into 2 rooms by adding a door in living room and a Work ~vall in the existing master bedroom. Fees: Valuation Issued By: $1,100.00 Plan Approval $0~00 Permit Fee Paid $60.00 Date 9~4~03 [] Permit Voided The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section '11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pedorm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approva~before starting such activity. Signature ~-~ ~ )/~'Lf~'~ ~ '~'~._2 Date ?--~¢,~..~ Agent/Owner Address OSHKOSH WI 5490- 3716 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.