Loading...
HomeMy WebLinkAbout0103903-BuildingOSHKOSH ON THE WATER ,lob Address 356-380 S KOELLER ST Designer Category Type · Building (~ Sign Zoning CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner LANDMARK LIMITED PARTNERSHIP III Create Date Contractor R J ALBRIGHT INC. 223 - Alteration Offices, Banks, Professional Plan J3-95-0903 Canopy C) Fence C) Raze Class of Const: Size irreg No 103903 09/04/2003 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~) Floating Slab O Pier (~ Other (~) Concrete Block (~) Post (~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature of Work F380 S Koeller/Alterations to split this space into multiple spaces. Two spaces facing north and 2 facing west. The NE tenant space will 380. The address for each space beyond this, working west and around to the west face of the building will' HVAC Contractor Electric Contractor Fees: Valuati~ Issued By: ~'~ $10,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $65.00 Park Dedication $0.00 Date 09/04/2003 Final/O.P. 00/00/0000 [] Permit Voided J In the performance of this work I agree to perform all work pursuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hsi(Igdnea~l~)r;nd to~~ starting such activity. Date ?/'~./ Agent/Owner Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.