Loading...
HomeMy WebLinkAbout0103906 BOSHKOSH ON THE WATER .lob Address 741 WISCONSIN ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MARC W SPEES ETAL Contractor OWNER Category 141 - Exterior Remodeling No 103906 Create Date 09/04/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature RES/Install vinyl siding with 3/4" foam underneath, wrap soffit and window sills with aluminum, replace 12 windows (same size & style,) replace of Work side entrance door and patio door. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $10,000.00 Plan Approval $0.00 Permit Fee Paid $65.00 Park Dedication $0.00 Date 09/04/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 741 WISCONSIN ST OSHKOSH WI 54901 - 4362 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 141 - Extador Remodeling CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner MARC W SPEES ETAL Contractor OWNER OSHKOSH ON THE WATER Job Address 741 WISCONSIN ST Designer Category Type · Building Zoning Sign O_ Canopy (~ Fence (~ Raze Foundation Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms Finished/Living 0 Sq. Ft. Bedrooms Garage 0 Sq. Ft. Baths (~ Poured Concrete 0 Floating Slab 0 Pier O Concrete Block (~) Post Not Required No 103906 Create Date 09/04/2003 Plan Occupancy Permit Park Dedication Size 0 Height 0 Ft. [] Projection 0 Stories Canopies 0 Signs · Other (~) Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature ~,ES/Install vinyl siding with 3/4" foam underneath, wrap soffit and window sills with aluminum, replace 12 windows (same size & style,) of Work 'eplace side entrance door and patio door. HVAC Contractor Electric Contractor Fees: Valuatio~l~10,000.00 Issued By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $65.00 Park Dedication $0.00 Date 09/04/2003 FinallO.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to,C~cure any necessary approvals before starting such activity. Signature /~'/~..,. ~ ~'~,~ Date ~'/~/~ Agen[/Owner Address 74t WISCONSIN ST OSHKOSH WI 54901 - 4362 Telephone Number ~'~.O To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project Ps ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.